Tel No. (+86) 371-55629010

6t Agent Boiler Lithuania

The advantages of small electric steam 6t agent boiler lithuania heating What are? Small electric heating steam pressure steam boiler has a variety of specifications, power electric heating steam boiler can choose. Electric heating steam boiler to electricity for energy, no noise, no pollution, no excretion, is a green product. Small electric heating steam boiler by the electrical control, ease of installation and matching; large boiler (500 kg) of the furnace body and an electronic control means to prevent electrical control portion of the furnace to high temperatures, to ensure stable operation. Temperature achieved by the automatic control cabinet. Using only heat and electric heating control process, a thermal efficiency of 97%. Advanced computer boiler controller has reliable performance, high degree of automation, easy operation. The use of high-quality electrical components to ensure product life. When the boiler risk of leakage occurs, the controller automatically disconnected from the supply, to avoid electric shock. Automatic replenishment: When the water in the boiler is lower than the safety level, heating the heating tube is automatically stopped, to prevent damage caused because dry, water and lights LEDs. Typically, the ground should be well connected with the Earth. Steam overpressure protection: When the boiler steam pressure exceeds the set limit pressure relief valve start and release the steam to reduce the pressure. Overcurrent protection: When the boiler overload (high pressure), earth leakage circuit breaker is automatically disconnected. Power Protection: by means of advanced electronic circuit detects an overvoltage, undervoltage fault state, reliable power protection.

Gas hot water 6t agent boiler lithuania safe operation of the precautions which the following are a few precautions and accident prone: a convection tube, water wall tube blasting reasons: l, substandard materials; installation does not meet regulatory requirements. The layered wall, does not reach the level of weld quality requirements, and other remnants of the inner tube. Wall causing local overheating and burn; 2, feed water quality does not meet standards. Resulting in scaling the wall structure, affect the heat transfer. And cause the wall temperature of the superheated blasting; 3, due to wear of fly ash. So that the wall thickness reduction; 4, fire shutdown heated too fast or too fast, so that the uneven thermal expansion of the tubes. Causing weld cracking; 5, the boiler load is too high, resulting in uneven burning and the outer tube squib severe coking and other reasons. Preventive measures squib: l, before the installation of the pipe rigorous re-examination, have welding welding process instructions; welding quality to meet the design requirements. After the pipe installation to test the pipeline through the ball, passing rate of 100%. 2, to strengthen the water quality management, a test class and demineralized water to achieve the water quality standards, regular inspection and regular elimination of scale and sewage; 3, water wall tubes and pipes to regularly check the exhaust convection, found deformed or thinned tube to be replaced, keeping in mind that the quality of maintenance, must comply with regulatory requirements; 4, the boiler can not work overload control (predetermined limit), attention furnace combustion process, the combustion to ensure homogeneous, stable; 5, note that the tube coking conditions. To achieve timely clear focus and pay attention to leakage. Second, the hot water boiler explosion: the explosion is very serious accident. Damage to equipment and buildings and heating systems are serious. And often resulting in casualties. Analysis following aspects: 1, design and manufacturing problems; a poorly designed, the uneven distribution of traffic in each circulation circuit. Heat too much deviation, solder angular, square, flat plate structure, the steel does not meet the requirements; good manufacturing and repair process. In particular dismay welding quality cells prone to rupture; 2, boiler overpressure eleven operating pressure exceeds the allowable working pressure. Stress plate (internal pressure) higher than the ultimate strength of the steel sheet caused cracking. The main reason is the failure of a safety valve, pressure gauge malfunction, Station Gauges indicate the error. Operating personnel did not take appropriate measures. Not strong sense of responsibility caused; 3, overheating; burned steel overheating broken, or too thick scale is mainly due to the water pan grease or other debris caused by blockage heating surface; 4, corrosion; inner and outer surfaces being coated plates severe corrosion of the steel sheet thickness reduction, the steel sheet insufficient strength caused by rupture; for the above reasons. Summarize a few precautions: l, for manufacturing defects in the design should take the following measures: First, reasonable design. Second, strict related materials, the preparation of three is correct manufacturing processes and process specification cards (including repair), to establish the necessary regulatory Fourth, Fifth, to improve the quality and sense of responsibility of the operators and managers; 2, to prevent overpressure . To ensure safety valve sensitivity and reliability. Regular automatic drainage time. Identify problems in time, also installed on a standard gauge for comparison. And regularly into the metering department inspection; 3, to prevent overheating. You must configure effective water treatment equipment and the establishment of the necessary rules and regulations. So that the boiler is not less furring furring and no accumulation of grease. To check the fouling situation boiler outage. If the scale. You must be promptly cleaned. Scale in order to avoid accretion; 4, preventing internal corrosion. Hot water boiler for larger capacity. The method uses thermal oxygen or chemical oxygen to resolve. In addition. To check the situation of internal and external corrosion. The extent of corrosion repair method such as pile up or Wabu according to (do this before the law, there must be approved by the technical units of the total work program and report to the local supervision departments boiler). To prevent the boiler explosion, regularly carry out the necessary checks on the boiler, at the same time, the boiler management departments should formulate effective measures, operators and managers must strictly enforce minor accidents occurred after the boiler shutdown for maintenance. Tell us about the repair of hot water boiler. 1, when the shutdown may not stop the pump immediately. To be checked after repairs boiler water temperature must be lower than the pump can be stopped when the 50 ℃, at the same time to turn off the water supply valves and heat supply network backwater valve and release the water pot. 2, before entering the boiler, the water must be emptied of all its boiler, sewage emptying all open. Manholes drum, hand holes headers have opened to air convection over time. To enter the interior work, you must pay attention: when someone is working inside. In certain drum outside a supervised. 3, before entering the combustion chamber or flue work. Ventilation must be taken, anti-virus, fire, explosion and other measures. And the total flue chimney flue or other operation of the boiler is connected to the gates are closed tightly. 4, voltage security lighting to use. If the flue inside the drum and more humid. Lighting voltage can not exceed 12V. If dry, the lighting voltage can not exceed 36V. But also have to do to ensure proper safety measures. Do not use open flame lighting.

Comprehensive reduce coal consumption, a few days ago, Baoding, Hebei Province issued a "blue sky Baoding win the Battle of three-year action plan" (hereinafter referred to as the "Program"), "plan" put forward specific solutions.

First, the heating pollution control

1, to reduce total coal consumption

Adopt an integrated coal reduction measures to reduce coal consumption. Reduction of new coal project alternatives. Complete bulk coal clean alternative area designated as a "ban on coal zone", in addition to electricity, central heating and raw coal coal-fired outside the "clear." Promote the use of clean coal, non-coal for electricity cuts, increase the proportion of electricity from coal. Enhance the proportion of clean energy, and actively develop renewable energy. Industrial Waste efficient alternatives such as coal and waste heat supply heat. Multi-channel expansion of natural gas supply, accelerate the construction of natural gas production, supply and storage sales system, develop non-fossil clean energy, give priority to renewable energy generation Internet, and actively carry out the heat, wind, solar and biomass energy use pilot projects. Encourage the development of biomass thermoelectric County have the resources to conditions of heat and power, biomass briquette boilers and scale natural gas chemical and biological substances. By taking measures to reduce coal comprehensive, complete province to decide Yajian coal consumption targets.

2, accelerate rural clean heating

To proceed from reality, should the electric power, gas should the gas, the coal should be coal, it should be hot is hot, the raised ring Beijing, the main city of Central City and other plain areas, rational distribution of science, science and progress targets set number of transformation to ensure the safety of the masses warm winter.

① heating diversified towns, villages conditional alternate embodiment of central heating.

② the completion of basic insurance North "ban on coal zone" and change to gas, electric construction of the main city, the main city ring accelerate dispersion of coal-fired and alternative Baonan key counties, and strive to three years to a total ban on the use of decentralized heating fuel Plains coal. "Substitution of gas for coal" adhere to the "gas will change" to ensure safe construction, safe use, security management, gas boiler energy efficiency of not less than level 2. The development of gas "pressure uninsured people" program, detailed list of contingency plans.

③ local conditions and actively promote photovoltaic solar, wind, biomass, geothermal heating mode, the implementation of solar heating pilot demonstration projects.

④ can not be implemented in rural mountainous areas clean heating transformation, and actively promote clean coal, and improve supply security system, the implementation of clean coal underpinning policy.

⑤ support agricultural production priority use of renewable energy, encourage the use of gas-generation coal, electricity generation of clean coal and other fuels such as coal generations, the phasing out of agricultural production in the plains with scattered coal-fired. 2019 basically completed the bulk of agricultural production of coal governance.

3, accelerate urban central heating

Promoting cogeneration heating energy structure, large-scale coal-fired boilers, geothermal energy, industrial waste heat as the main heat source, natural gas, electrical energy, biomass and other as complementary. Making full use of industrial waste heat, the conditions of the county to implement a city of a centralized heat source, synchronized planning and construction of central heating pipe network, and promote town extends to the surrounding heat source. Develop distributed heating gas boilers, electric boilers and other heat storage. Scientific and rational use of geothermal heating, into a film support regional development and utilization of geothermal heat pumps and the construction of gas distributed power station. Urban central heating can not cover all the villages in the implementation of clean energy alternatives.

4, strengthen the clean energy supply security

Establish a sound working mechanism of gas, emergency power supply security, oil and gas pipeline protection, on the basis of 2017 filled the gap on natural gas, natural gas plan focus on incremental substitution of gas for coal project in 2018, the 2018-2019 heating season to ensure that dual-generation project gas, electricity supply effectively improve the city's energy level security operation. Strengthen protection for air supply and power supply capacity, speed up the layout of the building and the city and county levels peaking gas storage facilities supply business, accelerate the improvement of the power grid and gas pipeline construction.

5, strengthen the bulk coal market and poor quality coal for control

According to sector regulation, local management, levels of responsibility and "who approved, who control", "who is in charge, who is the principle of supervision", strict bulk coal production, processing, storage, sale and use of corporate governance. Strengthen departmental interaction of law enforcement, strengthening the floor management to crack down on sales (including online sales) and use low-quality coal for violations. Strict control of industrial and civil coal quality, strict implementation of "coal quality coal for civilian goods" (GB34169-2017) standard, the quality of coal supplied to customers production and processing enterprises must meet the "industrial and domestic fuel coal" Hebei (DB13 / 2081-2014) local standards.

6, out of the transformation of coal-fired boilers to strengthen and deepen governance

Demolition firm covering central heating boilers scattered coal-fired in the area. The completion of the city 35 steam tons / hour and coal-fired boiler, stove and stove operating a small coal stove replace the task of transformation. Before the end of 2019, more than 35 tons of steam / h coal-fired boiler basically completed colored plume governance reform and ultra-low emissions, coal-fired boiler to retain the overall emission limits and achieve energy efficiency standards. Promote clean coal-fired boilers. A ban on new 35 steam tons / hour and coal-fired boilers. The main city and counties (cities, districts) ban on new built-up area 35 steam tons / hour and below a biomass boiler, more than 35 tons of steam / hour biomass boiler to achieve ultra-low emissions standards. Out central heating pipe network coverage and bulk coal fired boilers in the range, it does not have the area in cogeneration district heating conditions, and the like may principle of volume replacement, construction of large-capacity coal-fired central heating boilers alternative. Start the implementation of the transformation of low-nitrogen combustion gas boiler.

7, improve energy efficiency

Implementation of dual control action the total energy consumption and intensity. Improve energy efficiency standards, develop, promote energy-saving technologies and products to achieve key energy industries, energy-saving equipment standard full coverage. Increase efforts to promote green buildings, new urban civil implementation of green building standards. Promoting intelligent heating system reform, promote the transformation of urban residential energy efficient building renovation have value, promote Murai housing wall energy saving, improve energy efficiency of urban and rural housing construction.

Boiler and quantities to be adjusted with the feedwater phosphate treatment: 6t agent boiler lithuania, it works, and whether the tonnage-related? And, what is phosphate treatment boiler feed water? Boiler combustion process, the need to control and regulate which of several physical quantities? These can be said that the important issues are the boiler, So without further ado, to answer immediately, so that we clearly understand and grasp. 1. whether the boiler works as the tonnage-related? This question, the answer is no, because, no matter how much tonnage of the boiler, will not affect how it works. That is, between the boiler and the tonnage works, is little to do, so between them, are not necessarily linked, independently of each other. 2. What is the boiler feedwater phosphate treatment? In boiler water, addition of phosphate, and thus, avoid occurrence limescale inside, and basic corrosion. In this case, you can avoid some of the problems, and thus to improve the efficiency and effectiveness of the boiler. It generates slag, it is possible through the boiler blowdown, be discharged.