Tel No. (+86) 371-55629010

Supplier 8t Boiler Machine Georgia

Gas supplier 8t boiler machine georgia furnaces and cooking formal operation of the boiler furnace 1, and its object is to clear the body of the boiler impurities, grease and rust. The inspection of boiler installed and cold test run, each member confirms perfect safety conditions have hot start operation to start cooking stove. 2, boiling out dosage (see table below) Unit: kg / t rust grease Drug Name Notes thicker thin rust grease sodium hydroxide (NaOH) 2 ~ 33 ~ 4 trisodium phosphate (Na3PO412H2O) 2 ~ 33 ~ 4 when no trisodium phosphate, sodium carbonate can be used (of Na2CO3) in place of an amount of 3 to 6 kg / t water. 3, when dosing, the low water level in the boiler water should, boiler water should be the highest level, the drug was added on the stove interfaces (e.g., valve opening) when the cooking stove. 4, the end of the cook should the boiler furnace pressure was kept at about 75% of the working pressure, time is generally 2 to 3 days. 5, during the cooking stove, boiler water periodically take laboratory analysis, alkalinity boiler water of not less than 45 meq / L, should be added or dosing. 6, oven cooking is completed, the drum and the current tank should be cleaned precipitate, rinsing the boiler and in contact with the agent through a valve, to check whether or clogging sewage. 7, after cooling boiler, furnace water will be fully released. Open manholes, hand holes, repeatedly washed with water until the furnace no rust, grease qualified. (Ix) a test run, the test run should be with a load, for 4 to 24 hours (set maximum, minimum operating pressure). 2, observe the safety valve and various safety accessories, protective devices and other operations are sensitive and reliable. 3, after the commissioning of qualified, supervisory inspection agency should be acceptance.

Meanwhile, premix condensing gas supplier 8t boiler machine georgia is also designed with great compatibility and adjustability, the boiler can perform maintenance on the part of the module without stopping the overall operation, to achieve true online maintenance, truly simple operation.

Beijing SL Pharmaceutical Co., Ltd. as China's key high-tech enterprises, has great influence in the pharmaceutical industry. In early 2017, two-Heron relevant person in charge to get in touch fast supplier 8t boiler machine georgia, double-Heron Pharmaceutical according to demand, our company to provide a 1-ton split steam condensing steam boiler, and is responsible for subsequent transportation, installation and commissioning work .

In order to promptly eliminate the second combustion, use carbon dioxide extinguishers, extinguishing the steam pipe may be installed at the rear of the supplier 8t boiler machine georgia heating surfaces. Steam pipe should fire uniform distribution, less resistance to smoke, soot blowing does not affect, does not leak tight, which displacement sufficient suffocation secondary combustion.