Tel No. (+86) 371-55629010

Boiler Plant 1t Agent Belarus

Industrial boiler plant 1t agent belarus water quality standard industrial boiler water quality standards, the new range of water quality standard industrial boilers This standard specifies the quality requirements during operation in industrial boilers. This standard applies to the outlet steam pressure less than the rated 2.5MPa. Water as a medium and fixed in steam boiler steam boiler water as a medium is also applicable to a given water as a medium pressure hot water boiler and pressure hot water boiler. Second, the industrial boiler feed water quality standards 1. Steam boilers and steam boilers are generally required to use chemical water treatment outside of the pot, and the water quality must meet the requirements in Table 1. Tends to 1) hardness Lc basic unit (1 / 2ca2 + 1/2 Mg (2+), the same below .2) alkalinity MMO1 / L basic unit is C (OH-, 1 / 2CO2-3, HC03 -). On the alkalinity index value is not high boiler after reporting to the local boiler and pressure vessel safety supervision mechanism no overheating, which can be appropriate to relax the limits on the alkalinity index. 3) When the amount of evaporation than or equal to the nominal 6t / h boiler should be oxygen, localized corrosion was found, measures to be taken deaerator feed water, the oxygen content of the boiler feed water or steam turbine should be less than when less than 6t / h boiler rated capacity equal to 0.05 mg / L. 4) If the dissolved solids is difficult to determine, by measuring the conductivity or chloride ions (C1 -) indirect control, but the relationship between conductivity and dissolved solids or dissolved solids and chloride ions (of Cl-) ratio should be determined EXP . food. This ratio relationship should periodically re-tested and corrected. 5) only fuel, gas boiler 2, equal to or less than the rated capacity 2t / h, and less than or equal to 1.0MPa rated steam pressure, steam boilers and soft drinks dual boilers (steam, no special requirements such as quality) and the metering process can be application. But we must strengthen the boiler scaling, corrosion, monitoring water quality, good feeding, sewage and cleaning. Boiler water quality should meet the requirements of Table 2.

2, the second over protection

In the design of the secondary superheater boiler power protection, such as furnace temperature detected exceeds a set value, immediately cut off the main power source, prohibiting further increased boiler temperature.

Paper Mill 4 tons of steam boiler plant 1t agent belarus price is how much paper mill in the production process also need to use steam, we now need to purchase a lot of paper mills are steam boilers tend to be more concentrated in the tonnage of 4 tons, 6 tons is more Many. Pre-sales engineer fast boiler conducted for the specific situation of the paper mill a detailed understanding of the current needs of the mill 4 tons of steam boilers are produced to meet, for the price of 4 tons of steam boiler is about 40, including a full set of auxiliary equipment, through a simple understanding of the customer decided recently planned to plant site investigation.

Zhengzhou Sunrise Optoelectronics Technology Co., Ltd. by the Dongxu Group, Henan Province, the state-owned asset management companies and Zhengzhou Investment Holdings Limited jointly made, mainly engaged in flat panel display and solar industry design materials, manufacturing and sales operations. Sunrise Optoelectronics project has been put into a production line, the second phase will continue the expansion, three new production lines to meet the production needs of Project Phase II, Sunrise Optoelectronics urgent need to increase new boiler plant 1t agent belarus equipment. After investigation and screening of a number of boiler brands, determined to cooperate with the fast boiler, steam signed a 10-ton integrated condensing gas steam boiler (WNS10-1.25-Y.Q).