Tel No. (+86) 371-55629010

1t Boiler Plant Tajikistan

Comprehensive reduce coal consumption, a few days ago, Baoding, Hebei Province issued a "blue sky Baoding win the Battle of three-year action plan" (hereinafter referred to as the "Program"), "plan" put forward specific solutions.

First, the heating pollution control

1, to reduce total coal consumption

Adopt an integrated coal reduction measures to reduce coal consumption. Reduction of new coal project alternatives. Complete bulk coal clean alternative area designated as a "ban on coal zone", in addition to electricity, central heating and raw coal coal-fired outside the "clear." Promote the use of clean coal, non-coal for electricity cuts, increase the proportion of electricity from coal. Enhance the proportion of clean energy, and actively develop renewable energy. Industrial Waste efficient alternatives such as coal and waste heat supply heat. Multi-channel expansion of natural gas supply, accelerate the construction of natural gas production, supply and storage sales system, develop non-fossil clean energy, give priority to renewable energy generation Internet, and actively carry out the heat, wind, solar and biomass energy use pilot projects. Encourage the development of biomass thermoelectric County have the resources to conditions of heat and power, biomass briquette boilers and scale natural gas chemical and biological substances. By taking measures to reduce coal comprehensive, complete province to decide Yajian coal consumption targets.

2, accelerate rural clean heating

To proceed from reality, should the electric power, gas should the gas, the coal should be coal, it should be hot is hot, the raised ring Beijing, the main city of Central City and other plain areas, rational distribution of science, science and progress targets set number of transformation to ensure the safety of the masses warm winter.

① heating diversified towns, villages conditional alternate embodiment of central heating.

② the completion of basic insurance North "ban on coal zone" and change to gas, electric construction of the main city, the main city ring accelerate dispersion of coal-fired and alternative Baonan key counties, and strive to three years to a total ban on the use of decentralized heating fuel Plains coal. "Substitution of gas for coal" adhere to the "gas will change" to ensure safe construction, safe use, security management, gas boiler energy efficiency of not less than level 2. The development of gas "pressure uninsured people" program, detailed list of contingency plans.

③ local conditions and actively promote photovoltaic solar, wind, biomass, geothermal heating mode, the implementation of solar heating pilot demonstration projects.

④ can not be implemented in rural mountainous areas clean heating transformation, and actively promote clean coal, and improve supply security system, the implementation of clean coal underpinning policy.

⑤ support agricultural production priority use of renewable energy, encourage the use of gas-generation coal, electricity generation of clean coal and other fuels such as coal generations, the phasing out of agricultural production in the plains with scattered coal-fired. 2019 basically completed the bulk of agricultural production of coal governance.

3, accelerate urban central heating

Promoting cogeneration heating energy structure, large-scale coal-fired boilers, geothermal energy, industrial waste heat as the main heat source, natural gas, electrical energy, biomass and other as complementary. Making full use of industrial waste heat, the conditions of the county to implement a city of a centralized heat source, synchronized planning and construction of central heating pipe network, and promote town extends to the surrounding heat source. Develop distributed heating gas boilers, electric boilers and other heat storage. Scientific and rational use of geothermal heating, into a film support regional development and utilization of geothermal heat pumps and the construction of gas distributed power station. Urban central heating can not cover all the villages in the implementation of clean energy alternatives.

4, strengthen the clean energy supply security

Establish a sound working mechanism of gas, emergency power supply security, oil and gas pipeline protection, on the basis of 2017 filled the gap on natural gas, natural gas plan focus on incremental substitution of gas for coal project in 2018, the 2018-2019 heating season to ensure that dual-generation project gas, electricity supply effectively improve the city's energy level security operation. Strengthen protection for air supply and power supply capacity, speed up the layout of the building and the city and county levels peaking gas storage facilities supply business, accelerate the improvement of the power grid and gas pipeline construction.

5, strengthen the bulk coal market and poor quality coal for control

According to sector regulation, local management, levels of responsibility and "who approved, who control", "who is in charge, who is the principle of supervision", strict bulk coal production, processing, storage, sale and use of corporate governance. Strengthen departmental interaction of law enforcement, strengthening the floor management to crack down on sales (including online sales) and use low-quality coal for violations. Strict control of industrial and civil coal quality, strict implementation of "coal quality coal for civilian goods" (GB34169-2017) standard, the quality of coal supplied to customers production and processing enterprises must meet the "industrial and domestic fuel coal" Hebei (DB13 / 2081-2014) local standards.

6, out of the transformation of coal-fired boilers to strengthen and deepen governance

Demolition firm covering central heating boilers scattered coal-fired in the area. The completion of the city 35 steam tons / hour and coal-fired boiler, stove and stove operating a small coal stove replace the task of transformation. Before the end of 2019, more than 35 tons of steam / h coal-fired boiler basically completed colored plume governance reform and ultra-low emissions, coal-fired boiler to retain the overall emission limits and achieve energy efficiency standards. Promote clean coal-fired boilers. A ban on new 35 steam tons / hour and coal-fired boilers. The main city and counties (cities, districts) ban on new built-up area 35 steam tons / hour and below a biomass boiler, more than 35 tons of steam / hour biomass boiler to achieve ultra-low emissions standards. Out central heating pipe network coverage and bulk coal fired boilers in the range, it does not have the area in cogeneration district heating conditions, and the like may principle of volume replacement, construction of large-capacity coal-fired central heating boilers alternative. Start the implementation of the transformation of low-nitrogen combustion gas boiler.

7, improve energy efficiency

Implementation of dual control action the total energy consumption and intensity. Improve energy efficiency standards, develop, promote energy-saving technologies and products to achieve key energy industries, energy-saving equipment standard full coverage. Increase efforts to promote green buildings, new urban civil implementation of green building standards. Promoting intelligent heating system reform, promote the transformation of urban residential energy efficient building renovation have value, promote Murai housing wall energy saving, improve energy efficiency of urban and rural housing construction.

Select fast 1t boiler plant tajikistan factory in Henan What are the criteria? Henan fast boiler manufacturers with their own complete production system to solve customer requirements for boilers, along with the urbanization rate, the boiler into a large centralized heating equipment must be installed, some of the buildings built in the suburbs or rural areas select the object also need to purchase a boiler upgrade for the property, which serves the whole model of Henan fast boiler manufacturers will naturally become consumers of the national cash on delivery and perfect after-sale service are a one-stop Henan fast boiler manufacturers have the advantages are many species face of the market in Henan fast boiler manufacturers, there are several criteria which runs through the. First, the size of the production scale is relatively Henan fast boiler manufacturers to provide products generally in large majority, coupled with the growth in orders, must have a sufficiently large area of ​​the plant to complete a series of activities from production to the factory, and Henan scale fast boiler manufacturers in large part a reflection of the level of sales, indirect showed the popularity of the product. Second, product types and specifications in accordance with the different characteristics of the installation sites, consumer specifications boiler has a specific standard, large and small three general categories just simple summary, Henan need fast boiler manufacturers issued a strict model for the table Referring consumers, in particular the size and the amount of space that can accommodate a range of places later, can be selected to best meet the boiler plant. Third, the content service includes regular fast boiler factory in Henan sale of each boiler, will promise to provide consumers with after-sale protection, especially in the field of consumer plant will need to rely on transport equipment in the past, if the transport links in cause the device has been damaged, Henan fast boiler manufacturers can solve them, the demands of consumers and aftermarket manufacturers for clarification of what aspects included. Henan fast boiler manufacturers own strength directly determines the level of quality produced equipment, in order to choose good quality boiler, you first need to filter out the high professional level of Henan fast boiler manufacturers, product range and thus from the plant scale etc. Henan screened out fast boiler manufacturers are in line with each standard, the purchase of products in order to make people sit back and relax.

Emergency treatment and prevention of common accidents pharmaceutical factory 1t boiler plant tajikistans (two) common emergency treatment and prevention of accidents pharmaceutical factory boilers (ii) pharmaceutical factory boiler accident, there is a common boiler overpressure accident is an accident, such an accident or operation of the boiler pressure gauge is abnormal or improper supervision and inspection personnel, resulting in excessive pressure boiler without being in time, the following small series bring you a quick look at some of the emergency measures boiler overpressure accident. (1) reduction of fuel and air, reduced combustion. (2) maintain the water level in the boiler water level meter in a normal state, to avoid abnormal water level, the impact on boiler pressure. (3) will promptly discharged through the relief valve or the exhaust gas boiler manually. (4) timely investigation and the reasons boiler overpressure, and then take the appropriate measures in accordance with the actual situation. In short, during operation, be careful note of this, to avoid the treatment is not timely or improper operation, resulting in excessive pressure in the boiler accident, resulting in unnecessary boiler accident.

Horizontal small steam 1t boiler plant tajikistan which requires several parts and maintenance? Horizontal small steam boiler maintenance is more important, can reduce equipment operational failure, improve the life of the boiler, it is worthy of attention task. 1, meter maintenance: (1) cleaning surfaces, clean (2) replacement of packing, gasket (3) Repair or replacement of the meter cock. 2, gauge calibration: calibration gauge (1) sealed with the lead (2) Removing the water reservoir and bends and three-way cock check rust. 3, the safety valve: (1) timely maintenance and adjustment of the relief valve (2) replace the damaged parts. 4, boiler maintenance: (1) removing the soot surface and the inner surface of the heating surface dirt. Welding and expansion joint (2) Check the boiler. (3) Maintenance of water wall tubes. (4) external boiler becomes bright paint. (5) boiler operating at full capacity for more than 6 years or disable more than 1 year, shall hydrostatic test. 1 year after the operation, internal and external checks. 5, the furnace walls and furnace maintenance: (1) repair and replace the damaged boiler steel. (2) of the furnace, the furnace wall overhaul and repair of the furnace wall smoke leakage, leakage defects and internal corrosion of the furnace wall. (3) Insulation repair. 6, maintenance needs coal furnace slag and coal bucket processing apparatus: (1) a furnace overhaul and cleaners. (2) for maintenance of the hydraulic drive system, replacement of the cylinder. (3) the burner regulator. (4) running auxiliary motor is running.