Tel No. (+86) 371-55629010

5000kg hr steam boiler

When the heating area customers 10t gas heating boiler heating boilers in the choice of gas, usually attention to the problem of heating area, always other conditions, the greater the area of ​​the heating boiler, the customer's natural tendency will be relatively larger. The following small series to the heating area 10t gas heating boiler (hot water boiler) as an example for everyone to do a simple exposition. According to the current state of the ideal heating boiler 1t square area of ​​Zhengzhou Gas boiler in terms of 10,000 square meters, 10t gas heating boilers can provide 100,000 square meters of heating, of course, this is only an ideal state, specific to the actual situation and set. Of course, this is only tested out different boiler manufacturers for different strength of internal data, basically affecting boiler heating boiler area itself, we have to consider the thermal efficiency of the boiler, if the boiler process is relatively good, the use of boiler technology is relatively good, then the thermal efficiency of the boiler will naturally be relatively high, it will directly affect the heating area gas heating boiler. Currently the use of fast Zhengzhou party rigorous process, a more condensed excellent tooling equipment as well as independent research and development, premix technology to create the industry's relatively good gas heating boilers, boiler thermal efficiency can be basically maintained at between 98% -104%, and even higher, so that under all conditions appropriate opposite case, a large area for district heating. In short, the problem with regard to heating area 10t gas heating boiler, measured in terms of the different users of different standards, can be subjected to a simple comparison, choose your favorite, heating larger, transportation of 10t gas heating boiler safe and stable.

On February 28, 2013, 40t/h circulating fluidized bed boiler ready to delivery with ZG staff efforts. According to our engineer in 40 ton CFB boiler installation site, the project running on January 23, 2014. Guangdong Ruyuan 40 tons circulating fluidized bed boiler with the operating conditions. December 24, 2014, the CFB project is successful completed.

Anyang City Minshan Nonferrous Metal Co., Ltd. is a collection of urban mining, renewable resources, energy as one of the economic wisdom of cleaning companies, mainly non-ferrous metal extraction and processing work. Company to conserve energy, cleaner production for the purpose of this concept coincides with the fast boiler. Thus, when the company in the purchase of the product boiler, and fast boiler almost hit it off, by the party to provide a fast 6 tons of steam integrally condensing gas 5000kg hr steam boiler (WNS6-1.25.Y.Q).

Industrial gas boiler room Standard Operating Procedures industrial gas boiler room Standard Operating Procedures industrial gas boiler blast furnace ready to start: gas system: check the gas pressure and the internal combustion engine are matched pressure is normal, not too high or too low, continue under normal circumstances confirm Next. Water supply system: Check the water softening equipment running, the indicators softened water should comply with the relevant national standards. Check level gauge, level indicator switch must be opened, to prevent false water level, to avoid heating the intake air. Check pump for watering, otherwise opening the exhaust valve until the water so far. Stop watering until the water level of 2/3. Close filling pumps and valves. Line pressure: Open inlet and return valve, open No. 1 or No. 2 circulation pump, watching the pressure gauge pressure is normal, the pressure range, and the exhaust air inspection system situation. Electrical system: Check that all control buttons cabinet in an open position, if not open, turn on the switch, turn on the switch to open the order is part of the master switch. Industrial gas boiler flow: System water: Open replenishment pump switch or hand switch is turned on. Another choice is to switch the pump I or II selected pump. (1) is performed before rehydration is necessary to observe whether there is water inside the water softener;. (2) while discharging water and discharged from the bottom up high-rise buildings, water supply until the water flow stable and stops. Start boiler front pump (circulation pump), to open the boiler control cabinet, open the internal switch, the cabinet door closed, the circulation pump start switch is pressed, a green light, running forehearth pump (circulation pump), so that a uniform water circulation system. Start boiler: Press the boiler switch red switch button intelligent digital boiler controller, then press the green Start / Stop button, the green light and burner wind, wait a few seconds, the engine ignition, start a normal combustion. Check the record: all the equipment and check the pipes regularly check the boiler. Industrial gas boiler start-ignition combustion: ensure the main power switch, a button to open the burner, fan sweep should begin immediately. Burner ignition failure, fault lights for 20 seconds, press the reset button to restart consecutive three or four ignition failure, successful ignition, should be reported to repair. When the burner is closed due to some failure, each system should be checked to confirm or displacement. After the fault is acknowledged and eliminated, the burner will restart.