Tel No. (+86) 371-55629010

hot water boiler brands

Hot water boiler circulating water system should have the following hot water circulation pump suddenly stopped to prevent the furnace water vapor and water hammer is provided with a check valve 1. protection bypass duct between the circulating pump inlet and outlet pipe , its diameter should be similar and the manifold, and the bypass passage cross-sectional area of ​​not less than 1/2 of the cross sectional area of ​​the main pipe; valve flow direction should be consistent with the direction of flow of the pump. 2. Set weight of formula inching valve in the inlet pipe section of the circulating pump, drain pipes which overpressure can open the access to the tank or drain. Second, hot water boiler brands circulating water system is also designed to meet the following requirements: 1 should be mounted on each cut-off valve or valve outlet pipe boiler, boiler feed water, the supply should be located on the water shut-off valve and check valve. 2. The hot water boiler is running in parallel, the control valve to be provided on each boiler inlet, so that the deviation of parallel boiler water temperature does not exceed 10 ℃. 3. The portion of the high boiler outlet pipe should be installed and easy accumulation of gas and an exhaust gas collection means, not less than an exhaust valve DN20.4. Low system and the lower recesses, should be arranged drain valve and drain pipes . The hot water system should be water pipe back to facilitate the installation position Qingtao decontamination, before and after the decontamination and closing the valve should the pressure gauge, and a small charge of 1 to 2 ratio of the bypass pipe. 6. The boiler should be provided with a plurality of trap and sump for hotspots, catchment trap and drain valve shall be arranged, thermometers, pressure gauges.

This year, located in Guizhou Tongzi County and located in Heilongjiang Harbin has two boiler explosions accident, after investigation, the accident was produced in the installation link, there are companies the main responsibility for the implementation of incomplete installation link, confusion installation and construction management , unauthorized commissioning, pressure testing irregularities, installation supervision and inspection to ensure the role of the missing and other problems, leading to a boiler explosion occurs, causing adverse effects for the personal and property safety.

Market supervision bureau to draw lessons from the accident, in order to avoid explosion due to boiler installation problem from occurring again, issued a notice warning of the risk of boiler installation link. Details are as follows:

The boiler safety related technical specifications, the entire boiler manufacturing unit can be installed (set) mounted boiler units produced. Boiler manufacturing unit undertake installation work, should meet the following requirements:

The manufacturer should be dedicated departments boiler installation work, set up to cover the boiler installation quality management system, equipped with the necessary resources to installation conditions. Boiler manufacturing units should strengthen sales management, through specified in the sales contract if the terms of the unit responsible for the installation of boilers, etc., to prevent sales by the manufacturing license qualification units or organizations which are not allowed to undertake the unit personnel to carry out boiler installation work. Where specified in the contract manufacturing sales unit responsible for the installation, on-site installation work must be sent by the company to complete the installation personnel shall not be subcontracted to other units (safety specifications are allowed in the assigned project except). Indicate the sales contract to this unit responsible for the installation of the boiler, installation of the unit must have the appropriate license installed. Responsible for the installation of the units should strengthen safety education and skills training for installation personnel. Find that the installation quality and safety aspects of the occurrence of an accident or appears illegal activities, special equipment safety supervision institutions should be punished according to the law to install the unit.

Boiler installation units should strictly enforce the relevant safety standards and technical specifications to ensure the quality and safety of boiler installation, the unit should be installed at the installation site set up signs stating the name of the license holder of the certificate, license project, license number and items the person in charge, who is responsible for safety and quality, commissioning personnel, supervisory inspector's name, unit and telephone. Boiler commissioning and commissioning, operation must be performed by a licensed boiler operator. Before the boiler installation, inspection and acceptance by the relevant formally delivered, installed units should be hung in a prominent position boilers warning signs with the words "banned" and take effective protection and quarantine measures to ensure that the boiler system can not be ignited or boost . In addition to the need to debug, the cabinet can not be energized, the fuel valve is in a closed state should be like. Use blanking panels of the boiler pressure test, the test should be removed immediately after the end of the Blind.

Boiler boiler installation situation before construction units should be installed by informing the local special equipment safety supervision and management departments, and submit an application to install Supervision, Inspection and supervisory inspection agency. Where Supervision and Inspection uncommitted boiler installation project may not start.

Supervisory inspection agency should be strictly in accordance with the "Boiler Inspection Rules", according to the supervisory inspection protocol and progress of the project requirements, arrangements for the implementation of the supervisory inspector boiler installation supervisory inspection. A class of control points, the supervisory inspector must be at the scene confirmed to meet the requirements, the installation unit in order to continue with the work. Supervisory inspector shall, at the start that is to the construction site, in the whole process of site supervision to pressure test, shall not be used after the witness confirmed that and how do fill supervisory inspection program Supervision, Inspection and replacement process when the boiler pressure test.

Boiler manufacturing unit in particular is responsible for boiler installation of manufacturing units and boiler installation supervisory inspection agency, should an accident lessons learned, giving top priority to further implement the main responsibility and checks responsibility, strengthen the boiler installation management to ensure the quality of the installation work, protect the boiler safety.

How does power plant boiler working?

The power plant boiler generates high pressure steam by transfering the heat of combustion in various heat transfer sections. This part of the article series briefly describes the flow and arrangement of the heat transfer sections in a power plant boiler. In line diagrams help make the concept clear.

Gas boiler burner installation steps: gas boiler burner needs to be used to debug, Here's to Olin GRP-140, for example, describes the installation steps in the gas boiler burners, installation accessories you need before the next inspection, tool and instructions burner flange gaskets and screws, operation and maintenance instructions, a circuit diagram and circuit diagram dual temperature thermostat and a temperature regulator, gas system pressure regulator valve, a gas filter, gas flow gauges, analysis of an exhaust gas pressure regulator means and the intake pressure gauge, pressure gauge, and bellows, leak valve and the valve 2, the carbon monoxide content analysis tool belt, belt scale mbar gauge, the standard tool.