Tel No. (+86) 371-55629010

Boiler Commercial Price 4t Latvia

Introduction gas steam boiler commercial price 4t latvia furnace 1 cook, cooking stove main purpose is to remove impurities and grease inside the boiler, when the boiler domestic cooking oven adding the appropriate drugs, furnace boiler water becomes alkaline water, to remove grease and the like other debris. 2, when the cooking stove dosage device should meet the predetermined technical documents, such as when not specified, shall comply with the following table: Note: ①, 100% purity calculated according to the drug. ②, no trisodium phosphate, sodium bicarbonate may be replaced, in an amount of 1.5 times of trisodium phosphate. ③, sodium carbonate may be used alone cooking oven, which was added in an amount of 6Kg water per cubic meter. These drugs should be formulated in a uniform concentration of 20% concentration, the solid drugs can not be added directly to the drum ④, used cooking stove. 3, when the dosing boiler water should be at a low water level. Boiled water should be furnace in high water. 4, the end of the cooking stove boiler pressure should be maintained at about 75% of the working pressure, boiling out usually 2 to 3 days. Medicine name dosage (Kg / m3 water) sodium hydroxide (NaOH) 2-3 trisodium phosphate (Na3PO4.12H20) 2-355, boiling out period, taking periodic laboratory analysis of water heaters, are not low-alkalinity boiler water 45 mEq / l, or should supplement dosing. 6, oven cooking is completed, the drum and the current tank should be cleaned precipitate, and rinsing contact with the liquid inside the boiler through the valve, without clogging sewage check. 7, after the boiler to cool, open manholes, hand holes, rinse with water inside the drum, and check. 8, after the boiler by boiling out, should meet the requirements series: ⑴, no grease drum inner wall; ⑵, after wiping the inner wall of the drum surface should be free of metal deposits rust.

Heating boiler commercial price 4t latvia auxiliary equipment and piping installation requirements What? Heating boilers in which the mounting auxiliary equipment and pipe specifications, and there are some specified requirements. Therefore, the following specifically explain, elaborate knowledge of the content it contains, which allow us to clearly understand that in order to have a firm grasp, and be applied flexibly. Heating boiler, the mounting regulate their auxiliary equipment and piping, it is mainly: (1) for the auxiliary equipment based on the strength of the concrete, is necessary to meet the design requirements, so that it can be securely mounted boiler. In addition, the foundation coordinates, elevation, location and geometry of the bolt holes, etc., but also meet the requirements, so as to. (2) The open boxes, cans and the like, to be installed before the full water test, which is generally filled with water, and allowed to stand for 24 hours to check for leaks or leakage problems, yes, then the test is not by. In addition, the hydrostatic test should be carried out, time is 10min.

How to choose a gas boiler commercial price 4t latvia? What are the conditions subsequent industrial use? Use of gas-fired boiler, and the need to be able to transfer energy in the energy conversion process, the energy and transport than the boiler energy to chemical energy, and high-temperature conversion of the energy ratio, with large energy transfer equipment, steam boiler are often seen in the rapid conversion of energy, and high temperature, the energy, and organic heat carrier point of view, high energy storage and the use of a water container of a steam boiler. Contrast to the native plus efficiency, dye gas boiler can quickly enhance their efficiency in the use of gases and vapors, as well as in the industrial market life, be able to quickly provide heat, such alignments can be seen gas boiler means and mechanical energy change, there may be a lot of problems, resulting in the use of electricity or mechanical boiler, the efficiency of the product complex phenomenon, gas boiler itself is a hot furnace. The use of industrial life, as well as the appropriate product conditions evident from the industrial point of view garden, heating equipment, as well as the release of heat radiation, the use of gas-fired boiler, gas boiler and the installation of large, has a direct impact on a lot of gas boilers in accordance with classification of fuels in electricity and fuel gas steam boiler on. Poor efficiency, but also makes the overall structural configuration, and will be a lot of errors possible problems, one of which is now purchase high-end gas boiler must be addressed in problem-oriented. Experts said the market domestic production of gas boilers in constant integrated amplifier, but the personal aspects must be conscious to buy gas boiler, to avoid comparisons integrated, into the boiler for use do not know, or let the boiler purchase overpriced and so on.

The Fangkuai Group's unique full-operating boiler commercial price 4t latvia operation laboratory has an annual operating cost of more than 5 million yuan, which can simulate the operating conditions of various types of boilers under multi-operating environment conditions. The laboratory provides technical tests such as test and inspection, analysis and evaluation, data evaluation, energy saving and environmental protection, and special software from materials to complete equipment, hardware to software, and even complex large systems.