Tel No. (+86) 371-55629010

looking for high pressure boilers in south afrika

When such inspection revealed a large area of ​​the furnace wall damage, and will hob and the furnace wall temperature, must be shutdown for maintenance, such as alternate furnace is not in operation, the furnace can continue to operate, but the load must be reduced, increasing the combustion the negative pressure chamber, and pay close attention to the furnace wall, where the hob, the hob as a negative pressure is increased after the temperature rises to shutdown immediately exceeds 200 ℃.

2, when the wind is insufficient furnace, boiler combustion chamber and the upper portion of the top frame and the high temperature furnace, boiler load at this time to reduce or enhance the wind, and maintaining appropriate negative pressure in the boiler combustion chamber.

3, with adequate ventilation, reduce the temperature of the combustion chamber refractory bricks, the bore may be increased excess air to reduce the temperature.

4, when the external walls of the furnace with protruding phenomenon, should pay attention to whether it is likely to continue to develop, as not only the development and the destruction of the wall when the furnace should be shutdown for repairs.

Of course, this configuration will affect the price of steam looking for high pressure boilers in south afrikas, if the user is buying process only takes on the cheap price, the result will be so they have a high cost in use, or no automation and increase labor costs, but also a waste of energy costs in use. Because of this, the user buy this product, the first thing you need to compare between product configurations and prices, if it is a product of the price is high, but the configuration is very low, nature is a kind of performance is not worth .

Installation of the electrical installation of the looking for high pressure boilers in south afrika plant food construction projects in food plant boiler electrical engineering electrical engineering project construction method is a combination of ground construction project construction and equipment installation and commissioning of the process. The ground before construction, the cable should be installed according to the design drawings and specifications housing and outside the housing coated with rust. A second line is connected immediately after installation. 1, a cabinet is mounted an electronic control cabinet during transportation and installation should shock, moisture, deformation of the frame to prevent damage to the paint, and should be carefully examined unpacking specification, to collect information. When installed, the electrical control cabinet to be formed and is fixed to the base steel. b. secondary circuit drawings shall be constructed electronic control cabinet, in order to meet the design requirements, and comply with GB50171-92 standards. C. plastic bobbin thermal printing word end part of the cable cores and the number of coils, the number is correct and legible. Wiring neat, clear, beautiful, good insulation, without damage. e. floor distribution boxes should be based, water-proof in line pool.

In order to implement the CPC Central Committee stressed that the spirit of environmental protection, and improve ambient air quality, Zigong City, Sichuan Province, along the beach area Market Supervisory Authority vigorously upgrading coal-fired looking for high pressure boilers in south afrikas, coal-fired and successfully completed in 2018 within the jurisdiction of the county built-up area boiler out of the task.

It is reported that, along the beach area at the beginning of market Administration issued the "Notice on coal-fired boilers to establish long-term mechanism of control", strictly review the coal-fired boilers within the jurisdiction registered good customs, the illegal construction of coal-fired boilers firmly prohibit the registration, not be released "using the registration certificate." According to statistics, in 2018 a total cancellation of 38 coal-fired boiler units, which use the unit actively kills six, lost to corporate announcements of cancellation 32; guide the completion of the upgrading of clean energy companies working two boilers. Coal-fired boiler built in the region's county area have been "cleared."

This year, the beach area along Market Authority will also continue to promote the long-term control mechanisms coal-fired boilers, the "look back" checks that have been written off non-removal of equipment companies to speed up the removal of facilities and equipment, have been banned to prevent the resurgence of coal-fired boilers; non coal-fired boiler built in the county area, program of work, to prevent companies using untested boiler, timely elimination of scrap cancellation of registration.