Tel No. (+86) 371-55629010

boiler for company

Dry refers to the maintenance, shutdown the released water put in the furnace dirt rinse the pot burner Weihuo dried, and then the whole gas boiler for company drained, the valve is closed to all pipes, every three months check again.

First, the first own specific needs and boiler for company manufacturers use to inform and get him to recommend some suitable gas boiler equipment;

By means may correct and reasonable sewage drain boiler for company impurities in the water, sludge, scale, and control of the boiler water alkalinity and salt content, to ensure that the boiler heating surface clean, ensuring high quality steam output of the boiler, the boiler extended life, waste heat boiler is fully utilized, can achieve energy saving effect.

August 10, 2018, Shanghai Industrial Boiler Research Institute Co., Ltd. (hereinafter referred to as the working pot), the National Boiler and Pressure Vessel Standardization Technical Committee of Professional Committee of boiler for company energy conservation (hereinafter referred to as the Commission) was held in Chengdu, organizational GB / T16508 "shell boilers" revision of the second meeting of the reported revision of the second meeting, the main author of this standard, pot capacity standard Committee appointed sub-standard boiler, the special committee secretariat a total of 10 experts attended the meeting.

Organized by the Shanghai Institute of Industrial Boiler Co., Ltd. Deputy General Manager, committee chairman Wang Shanwu chair. He said the main author of the unit where the standard of support GB / T16508 standard revision of thanks and hope the standard revision process experts complement each other, support each other, the GB / T16508 benchmark revision as the boiler industry standardization work seriously treat, carefully modified. Amended in accordance with the basic principles of the first meeting to determine, in addition to technical support for the "Boiler Safety Technology Supervision" (referred to as "Boiler Rules"), but also take into account the needs of industrial boiler manufacturing enterprises, between consideration and GB / T16507 harmonization. At the same time listen to opinions, to further enrich the standard revision work force, give full play to industry leading products representative firm.

Yung pot boiler Technical Committee Standards Committee Secretary-General Zhang Rui introduced GB / T16507.1 "The first part of the water-tube boilers: General" and GB / T16507.2 "The second part of the water-tube boilers: material" revised draft of the general framework and main content.

Money Fenghua special committee Secretary-General reported on the GB / T16508 since revised "shell boilers" start, the main author of each criterion according to the revised terms of reference and requirements, the completion of the GB / T16508-2013 "shell boilers" since the implementation of the views of summary each sub-standard and contrast "boiler rules" (issued), the sub-standard job descriptions revised terms.

GB / T16508 the sub-standard main author of this according to the relevant sub-standard content and "Boiler Rules" (draft for approval) comparing the results of the relevant sub-standard and harmonized need to modify the content of the standard version 13 implementation of the existing problems and proposed amendments analyze and explain proposed amendments focus on the sub-standard and major amendments envisaged.

Experts on key issues related to the sub-standard for the exchange and discussion to reach a consensus on major revisions of this standard and requirements.

Meeting according to GB / T16508 revision schedule requirements, arranged next phase of work, the following:

1. Revision of Standards fleshed out power to complete the Standards Working Group set up before the end of August;

2. Please carefully review the main author of each standard GB / T16508.1 ~ 16508.8 major amendments description, and recommend changes, submitted to the Shanghai International Industry pot special committee secretariat by August 25;

3.GB/T16508 the sub-standard main author collected the views, modify the preparation of the draft (draft) on the basis of the draft text, submitted to the Shanghai International Industry pot special committee secretariat on September 30.