Tel No. (+86) 371-55629010

Coal Steam Output Boiler

Main steam coal steam output boiler temperature abnormal phenomenon of how to do 1, main steam temperature anomalies alarm. 2, the rapid variation of the main steam temperature, a secondary damper frequently significantly reducing water operation. 3, starting superheat outlet steam separator above or below normal. 4, if the steam with water, the unit will water shock occurs. 1 reason, the fuel and water supply imbalance, the separator outlet temperature abnormality. 2, coal combustion conditions change or affect, such as excessive load lift; and pulverizing mill administration system abnormality stop; means automatically increase or decrease the failure rate is too large amount of wind and the like. 3, the central flame furnace changes, such as the bottom seal damage, W and inadequate flame downstroke. 4, the control failure by warm water, warm water flow rate reduction is abnormally reduced or increased. 5, feedwater temperature mutation. 6, does not match the wind coal. 7, the secondary combustion heating surface. 8, furnace coking or fouling seriously. 9, heating surface leakage squib. 10, flue gas damper opening degree is not normal. 11, coal sudden change occurred. 12, the uniformity of the powder feeding substantial change occurs. 1 process, failure caused by unit coordinated coal - water ratio should be immediately released coordinate offset, in accordance with the current load demand, with reference to the start of the steam superheat separator, and adjusting the amount of fuel corresponding to the amount of water, with one, two main desuperheating water rapidly steam temperature control in a normal range; when the coal - water ratio should avoid imbalance after coal and water while adjusting; when coal - water ratio is adjusted to further adjust the load after a relatively stable; contact maintenance processing timely. 2, when the water supply system fault condition occurs a significant disturbance furnace should pay attention and automatically coordinated working conditions, so as not to manual intervention, when not working properly coordinated and automated, should be manually adjusted, stable water flow, referring to separation according to the water flow steam superheat, the adjusted amount of fuel, with a secondary spray water rapidly controlling the main steam temperature within the normal range; contact maintenance processing timely. 3, due to rapid changes in load caused by the load change rate should be adjusted; load change caused due to protective operation or the like caused by heat load to be quickly adjusted to maintain the boiler pressure of the main steam stability. 4, by warm water automatic dysregulation, should be appropriate Save warm tone is switched to the manual may be an intermediate point of the feedwater control system be corrected for temperature if necessary, or the feedwater to switch control to manual control, due to lower lifting and lowering the load speed to prevent steam temperature, promptly contact a service process. 5, the boiler furnace cause severe fouling and coking of the main steam temperature anomalies can be corrected by an appropriate degree of superheat outlet steam separator start, adjust, and in a timely manner and the furnace heating surface sootblowing. When the platen superheater sootblowing or superheater outlet temperature is still above normal and a secondary reducing water damper fully open, to check the furnace and the combustion air distribution system is normal, the checking process to reduce still overtemperature unit load. 6, flue gas damper adjusted to an appropriate opening degree. 7, if the bottom seal after losing back to normal immediately. 8, to strengthen the turbine expansion, differential expansion, axial displacement of the shaft vibration and bearing temperature monitoring, if abnormal, the process according to the corresponding regulations. 9, after the above measures, if invalid, should immediately drop the load process. 10, in front of the main steam temperature main steam 50 ℃ drastically reduced within 10 minutes, should an emergency stop.

You must know the problems of energy consumption coal steam output boiler (boiler thermal efficiency) 1, because the thermal efficiency of boiler problems of a high exhaust gas temperature. b sootblowers into low. c ash combustible large. d is too large or too small boiler oxygen. e heat loss is large. f large air preheater air leakage rate. g coarse pulverized coal. h steam - water quality is poor. I defective equipment, operating parameters are forced down. 2, measures to solve the problem of a lower exhaust gas temperature. b timely elimination of soot blowers defects and improve the investment rate of soot blowers. c reduce fuel ash, slag combustibles. d control the amount of oxygen in the boiler. e reduce heat loss. f air preheater to reduce air leakage rate. g qualified coal fineness control. h to improve the quality of soft drinks. i According to circumstances, the boiler heating surface adjustment arrangement. J burner when necessary transformation to fit the gaseous fuel.

Parties were quick to go to Shanxi Changzhi, coal steam output boiler security popularize knowledge of this year, fast boiler should Changzhi City, Shanxi Province Special Equipment Supervision and Inspection (referred to Changzhi City, the special prosecutor) was invited for Changzhi City, more than 200 enterprises use boilers unit representatives of the gas boiler safety and technical training. Fang fast professional engineers with many years of use awareness of the boiler, in simple terms, the boiler eleven points to secure technical knowledge, has won numerous praise.

How to avoid the food processing enterprises coal steam output boiler water pollution? How to avoid the food processing enterprises boiler water pollution? How to avoid the food processing enterprises boiler water pollution? It is well known in the food production process, many sectors need to use boilers, such as cooking, faced with the problem of sewage treatment, also with a certain level sterilization, dry, wine and so on. In the country's growing emphasis on environmental protection, continue to increase supervision of enterprises under the enterprise adoption of what approach to avoiding disadvantages, complete sustainable development? Primary, flue gas collection equipment processing equipment. Since SMEs by financial constraints, skills, and other places, a time can not be cut all the transformation, it is possible, after passing through the coal-fired boiler exhaust gas purifying exhaust purification device tail device, such as a fume hood, an exhaust gas collection processing device, effectively to prevent the direct discharge of black smoke, a serious impact on the surrounding environment. Second, clean power conversion, such as coal gas, coal to electricity. I learned that a beer factory invested more than 10 million will replace all coal-fired boilers, gas-fired. Now, 180 tons of steam boiler plant now farewell all coal, burning a low nitrogen gas cleaning switch, effectively reduce pollution. And compared with previous coal-fired boilers, coal saving more than 80,000 tons per year business.