Tel No. (+86) 371-55629010

biomass powered steam generator

1. The pressure test the electrical components of the electrical powered steam generator if the steam generator is completely assembled (i.e., as good as the boiler and the header connecting pipe, tube, heating the surface of the assembly line and the like). Header pressure test and assembly line can not, if they have been made in the component parts and hydraulic test or an ultrasound test of 100%, or other non-invasive test similar words. Upon completion of the processing of these components assembled, pressure is applied to test weld inspection no damage (radiation or ultrasound) to the full-length flaw detection. 2. All of the tubes, welded, cast, shaped parts and components, not all of the processing done in the hydrostatic test steel. Said component members of the hydrostatic test is not necessary, if they have done 100% ultrasonic testing or other similar NDT inspection. Superheater and economizer; while allowing the individual parts and components subjected to the hydraulic test in combination together with the electric boiler, not separate discrete electrical steam generator installation if reprocessing or hydrostatic test words. Included in the scope of the hydrostatic test all of the electrical steam generator, superheater, economizer, steam generation and processing power of the finished part. After working on the fixed plant boiler, is delivered to the sub-mounting parts, components, assemblies dispersion transportation, so the installation must be pressure test. Hydrostatic test purpose is to check electrical steam generator, superheater, economizer all density and strength member, all other members must also be welded hydrostatic test.

The contract is valued over €15 million and is set to be completed by the end of 2015. ZG will deliver one 135 MW steam turbine, with generator set and auxiliaries, including the water-cooled condenser for the coal-fired power plant.

Boiler plant equipment as three major important energy conversion device, fuel chemical energy into heat energy, and the pot was heated using thermal energy to become hot water having a sufficient quantity and a mass (steam temperature, steam pressure) steam turbine for use. The Anyang City, the power company to my company to buy a split 2 tons of steam condensing gas steam boiler for supplying electricity demand. The WNS series split condensing boilers using advanced technology designed to greatly improve the thermal efficiency of the boiler, up to about 96%.

How Jinju small steam boiler to buy a particularly large number of companies in fact the number of small steam boiler needs a lot, so this kind of small steam boiler, also known as the steam engine, the water temperature of the combustion engine reaches 100 degrees Celsius, will quickly form a saturated steam, thus achieving the production needs of buyers. This is we often want to know the small steam boiler. So how about we buy steam boilers, in fact, we generally can be to buy from fuel steam boiler or own superiority, some consumers need to solve the power output on their own, we can buy the electrical energy of the steam boiler can greatly reducing the cost. If the steam boiler extraordinarily large size, fuel gas line did not penetrating, optional biofuel steam boiler, can weaken fuel costs, the production of biofuels by himself, can quickly achieve combustion of the fuel. If the value of the saturated steam demand exceptionally small, optional she said powered steam generator, with a small cost to do a big demand!