Tel No. (+86) 371-55629010

steamer boiler for textile

After gas steamer boiler for textile in place, the installation can proceed to the matters specific installation process is as follows:

1, the valve is installed

One of the most important parts of steamer boiler for textile-drum

The whole structure of boiler consists of boiler body and auxiliary equipment. In boiler body, two main parts are furnace and drum. We have explained the furnace before, today, let's take a look at the drum.

When steam steamer boiler for textile inspection, the construction side, users should be forwarded the following technical data provided by the factory boilers. (1) Boilers pattern (including general view, installation diagram, FIG main pressure member and electrical lines in FIG.). Strength (2) pressure element calculations. Emissions calculated valve (3) (4) boiler quality certificates (including factory certificate, proof metal material, and the welding quality certificate proof pressure test. (5) boiler installation instructions and instructions .2, steam boiler installation the process of acceptance of the relevant information

Since more than six months since the steamer boiler for textile equipment, heating and hot water supply well, our technical staff also view real-time remote monitoring and control through the use of the boiler to the scene, Baiyun Quan Lake hotel management staff related to our technical staff gave very great encouragement and affirmation. --customer feedback