Tel No. (+86) 371-55629010

steam boiler with iron china

The difference between water-tube boilers and fire tube boilers What is the difference between water-tube boilers and fire tube boiler heating surface is what water tube boiler arrangement more convenient. But demand for higher quality and operational levels, good heat transfer performance, the structure can be used for large-capacity, high-parameter condition, water demand and water tube boilers. Fire-tube boiler because of its small capacity for small tonnage of the boiler. Fire tube boiler was developed on the basis of the advantages of the boiler water and fire tube, it has the advantages of both. Simple structure fire tube boiler, water, a large volume of steam, the adaptability of the load changes, requires less than quality water tube boiler. Currently on the market fire tube (boiler shell) boiler. Compact boilers and pipes buried heating boiler (fire tube). Generally made fast loading boiler, water tube boiler may also be small-capacity loading boiler made fast, easy to transport and on-site installation. 10 tons rarely used water tube boiler, water tube boiler water quality requirements are higher, heating, high thermal efficiency, large quantities of steam, the high boiler quality requirements fire tube, a small heating area, low thermal efficiency, compact structure, small volume, easy to maintain and repair.

Wuhan Yu Dahua Group Co., Ltd. is a cotton based, weaving, knitting and textile car decoration installation in one of the cross-industry, diversified and comprehensive export-oriented enterprise groups. 2017, the Group expanded production scale textile processing, the number of new production lines, the Group's original steam boiler with iron china can not meet the growing demand of orders in urgent need of a new steam boiler purchase. When selecting vendors steam boiler, the boiler output device side fast sustainable high quality steam attracted, decided to cooperate with the fast boiler. Fast art by side to the user site needs analysis, to provide two integrally condensing gas steam boiler (WNS4-1.25-Y.Q).

Secondly, modular boilers with a general volume is very small, fast boiler produced one ton of hot water boiler, the minimum volume of 1.2 cubic meters, demand is not high on the boiler room, basement, semi-basement, the ground can be, and the boiler room area is also very small, more suitable for the high cost of urban centers.

Boiler water treatment method properly, how to solve? There are many business units to be able to save more spending often treated boiler water will take unscientific methods and tools in boiler water treatment process used, equipment, etc. also do not comply with the relevant provisions, For example, three free, antifouling electronic scale equipment and the like. Speaking from personal interests, this approach not only to minus expenses chemicals can also be removed from water analysis personnel expenses, but not fundamentally solve the problem of boiler scale and corrosion, but not only resulted in a waste of energy also reduces the life of the boiler. Also, if used improperly will play a scale inhibitor for the protection of the boiler opposite effect, accelerate the scaling and corrosion of boilers, to the normal operation of the boiler poses a serious threat. Solution: For the case of improper boiler water treatment method to re-adjust the boiler water treatment, for the use of new technologies to be approved by the relevant departments for the record and to report to the local labor department, before proceeding on a given boiler processing of new technology, if the boiler water treatment to get good results, then the promotion of technical appraisal given by higher authorities after passing the boiler in order to ensure safe use.