Tel No. (+86) 371-55629010

8t Condensing Boiler Kazakhstan

Drum 8t condensing boiler kazakhstan load adjustment What does it mean? Since the metal-clad steel furnace steam consumption more than 10% to 15% once-through boiler, a relatively large volume of water, so the higher the heat storage capacity of the boiler drum, and drum vapor space can store a certain amount of steam. When the same amount of fuel, when the load changes, the boiler steam pressure changes slower.

In a number of bidders, the party quickly ready gas water tube 8t condensing boiler kazakhstan with its unique advantages of low nitrogen come out on top; the low nitrogen gas water tube boiler has the following advantages. 1, boiler factory ready, body welding, manufacturing completed in the factory, quality is the best guarantee to ensure the long-term safe and reliable operation of the boiler. 2, a small work site installation, short cycle, the boiler body all-membrane wall structure, effectively reduce heat loss boilers, to improve the thermal efficiency of the boiler. 3, boiler furnace, convection and rational use of two-pass arrangement flue gas velocity, effective control of the flue gas resistance, no fan, lower operating power consumption, energy saving. 4, micro-pressure combustion, the boiler to prevent the air leakage phenomenon, to effectively control exhaust excess air coefficient, reducing heat losses, improved boiler efficiency. 5, with forced water circulation system, the flow rate of each process are selected in accordance with the recommended standard upper limit value, to ensure that the cold boiled heating surface does not occur too, causing water hammer or squib; preventing sedimentation oxygen corrosion and impurities in the water, to avoid heat boiler accident damaged surface;? burner flame, gas overpressure or low pressure, 15 kinds of safety warning and fault protection device leakage protection, gas, comprehensive guarantee safe operation of boilers;? intelligent integration operation control system, with touch-screen operation Dual purely manual control buttons and functions.

Step two: clean water, cleaning the equipment and 8t condensing boiler kazakhstans connected, use water to wash cycle for 10 minutes to view system status, whether there is leak, with the rust washed off.

10.5 MW YY(Q)L thermal oil heater for rubber plantWuxi kanglong Rubber Products Co. Ltd. produces rubber and latex products including gloves etc.. During rubber material manufacturing process, vulcanization needs heating under 190-220°C, and finally create rubber. if by using steam 8t condensing boiler kazakhstan, the corresponding steam pressure is at least 2.5MPa, this boiler will be much more expensive and the whole system will be more expensive with high request. So thermal oil heater has unique advantage in rubber plant. It can reach high temperature under normal pressure; boiler construction cost is lower than steam boiler. Also, oil transfers heat more stablely, it guarantees product can reach accurate temperature, which makes process more accurately running. This heater has compact structure, it is transport as a whole bodyinvestigation, Wuxi kanglong Rubber Products Co. Ltd. chose ZOZEN thermal oil heaterwith capacity 10.5 MW.