Tel No. (+86) 371-55629010

6mw coal fired hot water boiler shipment to uzbekistan

Xiamen Rui Yi Hotel is available straight left Gulangyu the most beautiful views of the BRIC countries delegations designated top hotels, the best location in the heart of Xiamen, modern trends and classic style pavilions. The hotel features well-appointed room service, fashion and superior restaurant, bar, meeting rooms and a gym, swimming pool and other recreational facilities, people feel contented and comfortable. Projects and programs as Xiamen Rui Yi Hotel Xiamen City landmark hotel building, attaches great importance to environmental protection philosophy, which party fast boiler manufacturing philosophy coincide. In late 2016, the two sides signed an electric steam boilers for hotel supplies disinfection work, since the electric steam boiler, any security incidents never happened, Rui Yi Hotel ensure normal operation.

Recently, many users of the phone does not know how to shutdown after the steam boiler maintenance, boiler maintenance is very simple in fact, today we explain the steam boiler and 6mw coal fired hot water boiler shipment to uzbekistan shutdown after: After the steam boiler maintenance shutdown method how maintenance. Since the cause of boiler failure or power shutdown required boiler, a steam boiler before travel should stop combustion boiler, the boiler slowly lowering the temperature until no pressure boiler, should pump before shutdown, induced draft fan and turn off the blower. After the maintenance shutdown home for boiler, furnace divided into external corrosion and home for the pot. Pot corrosion enjoying, enjoying their home for two kinds of wet and dry selected based on the length of shutdown time. When long-term disabled boiler, furnace should be paid close attention to external corrosion problems take care of themselves. First, the boiler shutdown cooling is necessary as far as possible completely eliminate fouling and ash grate heating surface of the upper, the lower portion of the furnace. Then have to adhere to certain natural ventilation flue. Under normal conditions, should be placed to dry moisture-proof agent in the furnace, flue. The dry quicklime as used, the furnace or the flue gas per cubic meter of ordinary should be placed about 3kg. After placing all the ventilation should be tightly closed doors. Lime powder to change after change. Such as boiler rooms in low-lying position, the air during shutdown severe flood tide, the method should be used regularly and placed a small fire to dry dry agent phase separation. If the boiler boiler long time, in order to thoroughly clean the soot topcoat red lead oil furnace or other metal surfaces in the anti-corrosion paint. As for the way home for corrosion inside the furnace shutdown, the shutdown Yaoan the length of time to be. Under normal circumstances, no more than one month shutdown of the available wet home for a month or more should take care of themselves dry. Dry to pay attention when enjoying the following questions: Do not dry agent in direct contact with the metal outer boiler, can be housed in a container such as an iron plate; dry agent after standing, for shutting the hole and the other hand hole cover, the vapor, the water pipe necessary to cut off valve; variant lime powder should be replaced. While enjoying wet, to pay attention to boiler water condensate is preferably used, followed by the available existing boiler water, demineralized water again; after adding the base, with a slow fire boiler water is heated to 80 [deg.] C to 100 the pressure rose to 0.2 maintenance after 0.3MPa 2 to 3 hours, so that it reaches the furnace circulating water alkalinity balance, pressure is reduced, then fill the boiler water, a certain gauge, and continue to adhere to this pressure throughout the home for alkalinity should be regularly tests, decreases should be added at any time; in winter, wet enjoying pay attention to antifreeze, especially the local sewage channel and economizer; before re-use should release all the pot boiler lye, best prepared sump, in order to facilitate further use. At the same time should be rinsed with clean water. The performance characteristics of coal, oil, gas steam boiler

6 tph WNS series condensing gas-fired steam boiler project for printing and dyeing industrySteam boilers provide heat source for dyeing, drying, slashing and printing in printing and dyeing industry. Nantong New Dunhuang Dyeing Co. LTD. has always been providing excellent products and after-sales service to customers for the 16 years' constant development, main business including: yarn bleaching and sales, sales of carpet and garment fabrics and  decoration cloth. As the state is promoting the substitution of small gas-fired boilers, Nantong New Dunhuan decided to introduce one set of gas-fired steam boiler with sufficient output and high efficiency. A set of high-quality boiler is essential for a dyeing and printing enterprise, which can not only enhance productivity but also reduce operating costs. After some market research, Nantong New Dunhuang chose ZOZEN as their cost-effective boiler supplier. In the process of technical communication, New Dunhuang spoke highly of ZOZEN professional degree and ordered one set of 6 tph WNS series gas-fired steam boiler (WNS6-1.25-Q). This series of boilers is ZOZEN's own R&D and has good reputation in the market with excellent product performance. It has wide fuel adaptability, applicable to a wide range of fuels including natural gas, methane, coal gas, diesel, heavy oil, light oil, etc., It adopts a large-diameter corrugated furnace to ensure the completed combustion, along with a low NOx burner, the NOx emission can be controlled below 30mg/Nm3. The boiler features automatic and safe operation, can automatically adjust and protect the combustion condition, water level, temperature and steam pressure in the course of operating. ZOZEN also installed the condenser, economizer for the tail flue, which would recycle the flue gas and decrease the exhaust temperature below to 60 degrees. The thermal efficiency is as high as 98%, which is higher than the same products in the market.

Talk about the overall structure of the furnace boiler boiler boiler and auxiliary equipment, including two parts. Boiler furnace, drum, burner, water wall superheater, economizer, air preheater, and the furnace wall, etc. The main frame member constituting the core part of the steam production, called boiler. Boiler body is in two main parts and drum furnace. Today, we are concerned that the furnace boiler. Also known as boiler furnace combustion chamber, fuel combustion for space. It solid fuel on to the grate, referred to as a fire bed combustion furnace Stoker, also known as the fire-bed furnace. Solid fuel liquid, gas or pulverized, is injected into the furnace fire chamber may be referred to as a combustion chamber of the burner, also known as the furnace fire chamber. The coal particles and air hold it was boiling point of combustion, the furnace and adapted called inferior fuel combustion fluidized bed furnace, known as a fluidized bed furnace. An air flow so that the coal particles rotated at high speed, and strong burning furnace called cylindrical cyclone furnace. Boiler furnace cross-section is generally square or rectangular. Combustion fuel to form a flame in the furnace and high temperature flue gas, so the hearth around the furnace wall is made of refractory material and insulation material. On the inner surface of the wall of the furnace waterwall tubes often laid, it will not burn both protect the furnace wall, and absorb a large amount of radiation heat of the flame and the high temperature flue gas. In addition, the furnace design needs to fully consider the characteristics of the fuel used. Each boiler should be fueled with the original design of the fuel. Boilers running economy and reliability are likely to vary greatly reduced when using the characteristics of fuel combustion.