Tel No. (+86) 371-55629010

coal fired 1 ton steam boiler

3, easy

Gas-fired steam boiler in the use, operation is very convenient, so will much favored by all walks of life. Because the use of all natural gas pipeline, a sustained run without any problems. Eliminating the need to transport coal use and clean-up or stacking cinder and other tedious work.

4. Clean the reason why gas steam boiler in the market to get a high rating, but also because it is clean and not contaminated during use, and does not produce black bottom of the pot, there is no air pollution. Thus, in use, compared to other boiler is the cleanest way.

Calculated gas coal fired 1 ton steam boiler plant to explain your boiler heating area: Gas-fired steam boiler plant to you to explain the calculation method of gas steam boiler heating area of ​​the boiler, which is sure to install emissions-line monitoring devices, and, should environmental protection department of the monitoring center networking, so the job. And this kind of boiler heating area, specifically, then, is to be determined according to the location of the boiler, its usage and requirements. Generally speaking, if it is 1 ton, then, it is about 7000 square meters of heating area. 4 tons of gas steam boiler, which uses induced draft fan, then, that in the selection and configuration, generally speaking, if a different motor, then, there is a different choice, but specifically, then, is there are two First, Y5-47-6C, power is 15KW / 18.5kw, grade 2 is a motor; Second Y6-41-7.1C, power is 15kw / 18.5kw, the motor is four. 10 tons of gas steam boiler, between it and the workshop is to have a safe distance, and can not be a piece design, it must be independent. Therefore, it is generally to be more than 5 meters, so the job, however, can also be separated coal field.

How to improve the energy efficiency of industrial boilers 1, focusing on the transformation of practicality (1) above to recover waste heat can be effectively used. For example: high temperature organic heat boiler flue gas, but the process does not require the production of steam and hot water, attention should be considered heated by flue gas waste heat recovery techniques combustion air. (2) improved gas boiler should focus on energy-saving technologies improve the automation level of combustion control, precise control of the combustion state. (3) Consider first the application of energy-saving technologies and sophisticated equipment. 2, considering the technical nature to further improve the thermal efficiency of industrial boilers, it is necessary to consider new energy-saving technologies and equipment. Advanced (1) energy conservation technology and equipment, difficult to implement. Such as: waste heat recovery heat exchanger and the new technology: heat pipe technology, the condensed waste heat recovery technology; new water treatment device: microbial fouling and electromagnetic processing techniques (e.g., hydraulics); combustion automatic control technology. (2) spraying pulverized coal combustion technology (stratified combustion mode and suspension-fired boilers) design, construction and operation of high demand management, oxyfuel technology, such as high temperature air combustion technologies require large investments. 3, forming a complete transformation handle (1) must be considered boiler energy saving, heat insulation of synchronization is complete, sealing, and improved methods of burning fuel adjustment, and the fuel air distribution system of the inverter, reduced nicotinamide tube improved resistance to treatment. (2) pay attention to clean the boiler heating surface, and providing technical improvements boiler water, slag, ash, etc., to ensure that the boiler has good heat transfer properties. (3) the necessary training for technical operations and daily management of energy-saving equipment.

Since I began preparations for the 2018 ASME certification program, and at the beginning of the project preparation work since January this year, the project has entered a crucial stage of the implementation. Ms. Jiang Lianju quality system under warranty division led to ASME certification were careful overall planning work to develop a detailed plan of the evidence, and careful organization departments to participate in the work of the various stages of implementation.