Tel No. (+86) 371-55629010

Industrial Cheap Boiler 20t Armenia

In this way, a 1.4 MW hot water industrial cheap boiler 20t armenia can be used to heat 20,000 square meters. Of course, the calculation of the heating area of ​​the boiler also needs to take into account other factors. Such as residential environment, residential type, housing structure, heat dissipation, boiler material and so on.

Treatment squib superheater tube 1, a slight rupture superheater tubes, can be appropriately reduced load, to maintain operation within a short time, this time should be closely monitored leak situation, at the same time, rapid start standby industrial cheap boiler 20t armenia. If monitoring the situation worse, should be shutdown as soon as possible. 2, when the hose rupture severe superheater must be emergency stop.

Wuhan Port District Social Welfare Institute (apartments for the elderly) is invested by the government pension services, with a total construction area of ​​38,000 square meters, 532 beds, mainly adopt destitute persons, social support on behalf of the elderly. Hope to provide welfare to the elderly year-round 24-hour hot water, the original industrial cheap boiler 20t armenia equipment can not meet this demand, therefore, require additional purchase orphanage hot water boiler. After much investigation, in cooperation with the welfare determined fast boiler, provides three integrally condensing gas hot water boiler (WNS1.4-1.0 / 95/70-Y.Q) by a fast boiler.

3, gas industrial cheap boiler 20t armenia power usage 220V / HZ AC, must be reliable ground connection conductor, to ensure safe use.

4, the gas pipeline and the gas burner with gas for the pipe must be the link, the link can not be used flax, with raw materials must be used.

5, the gas pipeline is installed, open the gas valve, check the connection portion with the soap without leakage, if any leakage off the seal valve repair or replacement, and then check the gas boiler, until no leakage so far.

6, the boiler installation must be flat or rational design, as short as possible, less coarse, i.e. to shorten the pipe, reducing the curve, diameter to be rough. In addition the return path should be in charge of the gas boiler outlet back to the same diameter.

7, the slope of the natural circulation Sheung main channel slope and the return pipe are 3-5%, waves appeared not to prevent blocking gas pipes, exhaust system piping system should be placed high, and the installation of the valve can not be .

8, the lower mounting system blowdown valve, the tank should be higher than the bottom of the fill height of the water supply pipe, through the automatic air discharge valve opening can not be replaced, the valve can not be mounted, it must not be obstructed.

9, gas boiler system piping length, bend over, no gradient, heating should be installed ineffective circulation pump, water pump to be mounted on water supply pipes, the pump selected according to the size of heating area.