Tel No. (+86) 371-55629010

1500 heating surface boiler convert into ton

Professional manufacturers of condensing 1500 heating surface boiler convert into tons can meet the strength requirements of certain jobs.

First, we want to ensure that at the operating frequency of intermittent, not continuous work, thereby affecting the life of the condensing boiler.

Circulating fluidized bed is a relatively new technology with the ability to achieve lower emission of pollutants. Fluidized Bed Combustion which is the latest coal firing technology, gives very high combustion efficiency ( 95–99% ).The A dry topic hardly promises to be exciting. Not so in the case of fluidized-bed drying with internal waste-heat utilisation (WTA), whose development has been driven A fluidized bed reactor (FBR) is a type of reactor device that can be used to carry out a variety of multiphase chemical reactions. In this type of reactor, a fluid Circulating fluidized bed 1500 heating surface boiler convert into ton (cfb boiler) how does it work and its principle Process of CFBC, FBC fluidized bed combustion Boiler Operation In Animation Show You How steam flows and path of water and steam.

4 tons of gas steam 1500 heating surface boiler convert into ton blowdown should pay attention to what matters should be ① the sewage at low load, high water level. Close attention should sewage water level in the furnace, each sewage water level in the boiler to reduce the 25 to 50 mm is appropriate. ② if not through to the sewage outfall end of the tank or sewage well, and no protective equipment must be available in the sewage do know that no one is near the outfall place to avoid accidents when sewage. ③ particular sewage operation is as follows: two with each boiler blowdown valve, the first (the one away from the boiler) when only the second full discharge, then only slightly open first drain valve (latest one from boiler) to preheat the pipe until the pipe gradually turn up after preheating only a first drain valve, the sewage must be completed first gradually turn down the drain valve, shut off and then only the second drain valve, the purpose of doing so is to use only the first discharge, when leakage to keep only the first, only the second control emissions can still be used. When sewage if there is impact noise in the sewage, that is only the first drain valve should be closed until the small impact sound disappears, then slowly turn up the sewage should not be carried out continuously, so as not to affect the water cycle. ④ After the completion of the sewage close the drain valve, the drain valve is tight check, check is: closing the first drain valve only after some time, the second test only touch on the drain valve conduit hand, if the cooling blowdown there must be leaking valve.

It is reported, is located in Changji City, Xinjiang Uygur Autonomous Region is determined to win the battle pollution prevention and control, through the implementation of coal-fired 1500 heating surface boiler convert into tons, industrial control mentioned standard, smoke dust pollution control and many other initiatives, the quality of atmospheric environment sustained and steady improvement.

This year, Changji City will continue to improve the environmental quality at the core, out to win tough fight pollution prevention, environmental protection take interviews, special inspection, etc., to strictly implement the main responsibility for environmental protection and various functional units of the company, continued to carry out inspection of law enforcement to crack down on various types of environmental violations. Intensify its efforts in the "coal to gas", "coal to electricity" and other aspects, has in the Town of sulfur heating station implemented the "coal to electricity" project, Onishi canal Heng Xin heat, car city, nine branch offices, Yihai Oil company implemented a central heating alternative project, blue mountains Tunhe polyester company implemented the "coal to gas" project. With the implementation of a key environmental projects and put into use, the construction of sky blue, green, clear water of "clean Changji," the grand blueprint is becoming a reality.