Tel No. (+86) 371-55629010

sunflower seed fired boiler

Atmospheric horizontal condensing hot water sunflower seed fired boiler running though is based on automatic control design, with perfect protection system, but still require boiler operators must be qualified fireman, and should be strictly in accordance with the rules of personal responsibility and boilers, to ensure normal operation of equipment to ensure the safety and economy of boiler unit.

Computer-controlled monitoring data, in order to avoid too wrong data, affecting all aspects. After treatment by domestic physical and chemical reactions, combined with the choice of machinery sunflower seed fired boilers, even more convenient, whether it is gas steam boiler type, or general types of steam boilers, go through the real real contrast, but the future is likely to occur It will affect the order of the steam boiler.

Wuhan Port District Social Welfare Institute (apartments for the elderly) is invested by the government pension services, with a total construction area of ​​38,000 square meters, 532 beds, mainly adopt destitute persons, social support on behalf of the elderly. Hope to provide welfare to the elderly year-round 24-hour hot water, the original sunflower seed fired boiler equipment can not meet this demand, therefore, require additional purchase orphanage hot water boiler. After much investigation, in cooperation with the welfare determined fast boiler, provides three integrally condensing gas hot water boiler (WNS1.4-1.0 / 95/70-Y.Q) by a fast boiler.

This paper introduces the usage method of Fangkuai sunflower seed fired boiler. The chimney outlet of Fangkuai boiler is higher than 1.5m ~ 2m of boiler. The water supply of boiler should ensure the quality of water, use soften water equipment as far as possible, do not use water with more minerals, otherwise, the boiler will be easy to form scaling. Before starting the boiler, check the power supply and water source, and close the sewage valve to open the water supply valve, check the status of the pump, there is no stuck, at least once a day to discharge the sewage, sewage should be burned. The voltage of the power supply should be controlled within 5%, the 380v voltage must be three-phase five-wire power supply, do not connect the zero wire wrong, to the boiler To install the ground wire, the depth of the ground line is more than 1.5 m, the ground connection head is connected to the ground pile head, and the connection joint is more than 1 meter above the ground.