Tel No. (+86) 371-55629010

200T Cane Bacoalse Fired Boiler

Recently, Dezhou City, Shandong Province, has released the main points of pollution prevention and control in 2019, set specific targets and implement measures to control emissions of persistent pollutants SO2, NO2, to reduce the number of aspects such as severe pollution days.

1, continued to promote the total coal consumption control. Strictly implement the coal consumption reduction, equivalent alternative policy requirements. Continue to implement the monitoring and early warning mechanism to control the total amount of coal, coal consumption for the counties (cities, districts) were scheduled monthly, quarterly analysis, forecasting and early warning and timely release. Refined coal decomposition control mission objectives to ensure the completion of the annual total coal consumption control tasks.

2, strengthen renewable energy development and utilization. Actively promote wind, solar, biomass, geothermal and other renewable energy sources, promotion of power generation, industrial and residential heating and other heating applications. Achieve renewable energy consumption accounted for the proportion of primary energy consumption of more than 15%.

3, continue to promote the management of coal-fired boilers. The existing 35 tons of steam coal-fired boilers, according to ranking policy before the end of 2019 included in the phase-out plan. The inclusion of out of range, to ensure that out of the task before the end of 2020.

4, the implementation of low NOx combustion gas boiler reconstruction. To 2020 basically completed the transformation of low-NOx combustion as the goal, listing the existing inventory ledger gas boiler, to determine the transformation of an object, complete renovation in 2019 total about 50%. After transformation of NOx emission in principle higher than 50mg / m3. Achieve a stable concentration of nitrogen oxide emissions rebuilt 30mg / m3 or less (that is, ultra-low NOx combustion requirements) can be appropriate priority in provincial subsidies make up ecological civilization prize funds.

5, continue to promote clean coal. Strengthen clean coal production, supply, construction and distribution system, and continue to improve the implementation of the subsidy policy, to ensure the timely distribution in place to protect the people warm winter. Bulk coal market to strengthen the comprehensive improvement of law enforcement, the implementation of three coal detection mechanism to prevent inflow of low-quality bulk coal, clean coal to ensure quality standards. 2019, on the basis of full coverage in clean coal, continue to promote clean coal.

6, strengthen high-pollution fuel combustion zone ban construction. Combustion zone ban, a ban on new or expanded high-polluting fuel burning facilities have been built to the deadline to switch to clean energy. Investigate and punish illegal construction, expansion and high-polluting fuel facilities are not completed within the prescribed period rectification behavior. Ban on burning coal for a total ban on the circulation area.

7, continue to promote clean heating transformation. To proceed from reality, should the electric power, gas should the gas, the coal should be coal, should be hot is hot, warm winter to ensure the safety of the masses. Accelerate the pace of production, supply and storage of natural gas marketing system construction and gas storage facilities, improve air support capabilities. To develop multi-gas source, priority for clean heating, ensure safe and stable gas. Strengthen heating, gas facilities construction, expanding the central heating, gas, geothermal heating coverage. Accelerate the clean heating renovation project, before November 15, 2019 to complete the annual task of transformation goals. Complete power-generation coal, gas and other clean coal generation of heating transformation of the region, a total ban on bulk coal sales, to prohibit the sale and hoarding bulk coal, bulk coal to prevent the re-burning.

Gas condensate waste heat recovery 200t cane bacoalse fired boiler is how to do waste heat recycling?

Rapid socio-economic development, national environmental protection, energy conservation and comprehensive utilization of resources put forward higher requirements. Now, with the widespread use of gas-fired boilers in heating the heating industry, with coal-fired boilers with higher thermal efficiency, less polluting characteristics compared. Natural gas combustion in the boiler, about 90% of the energy is converted into heat, with a 9% energy loss and heat loss out of a 1% loss of energy through the surface of the heat dissipation. Thus, do a good job in front of the waste heat recovery work is particularly important.

It is learned that, with central heating Hohhot foreign loan program continued with the completed and put into use, the city built-up area will further strengthen the centralized heating rate, gas hot water 200t cane bacoalse fired boiler to replace the coal-fired hot water boilers layer by layer, to become the first to Hohhot the region of central heating gas standard shape of the city.

The possible reasons of dripping oil when 200t cane bacoalse fired boiler working: the nozzle installation position is too far from the combustion head; ignition electrode position is improper, and put into the fog oil; the nozzle and anchor install connection is not tight, but pay attention not too strong while installation; nozzle dirty or damaged, cleaning nozzle or change it; oil pressure is too low.