Tel No. (+86) 371-55629010

boiler with asme certificate

In recent years, Hebei Province People's Government to respond positively to Blue Sky Battle action plan promulgated by the state, and all of 35t / h coal-fired boiler with asme certificate and below in the Hebei province out of the transformation process. First Hospital of Baoding respond positively to the call of the provincial government, eliminate serious pollution of the original coal-fired boiler hospital, citing energy saving steam boiler to natural gas as raw material. After a series of market research, WNS Series Split hospital condensing gas boiler boiler other fast soft spot.

The three main factors that affect the quality of the work of condensing gas boiler with asme certificate condensing gas boiler is an alternative to traditional coal-fired boilers star product, now sold on a global scale. But there are still many users mind any doubt, do not know how to improve the quality of their own work condensing gas boiler. Fast boiler condensing gas boiler for many years research, we have made numerous achievements, specially as we summarize the main factors condensing gas boiler quality of the work of three impact. First, specific parameters matching device environment. Condensing boiler and the environment is to ensure system stability closely matches the fundamental, users purchase condensing gas boiler, we must first understand the various parameters of the interface where boilers, thermal energy value, pipe size, the spatial extent of the area and the like may be utilized to determine the type and parameters suitable condensing boilers combined with the original system uses heat energy, so it can guarantee the condensing boiler and the actual use of the environment is in line with the same. Second, following the instructions, the correct operation of the gas condensing boiler. Quality of work of condensing gas boiler is also associated with operating practices, when an operator to adjust the values ​​of various parameters of the boiler and the environment does not match, or the order of the different operations are also likely to lead to confusion when the boiler condensation process, the system Caton, resulting in the condensed water is too large, low pressure, or no change in temperature anomaly. Therefore, before using a condensing boiler and use it is best to have a professional guide and strictly follow the instructions. Third, the maintenance and repair of gas condensing boilers. For condensing boiler maintenance and repair on a regular basis, it is the main reason affecting the quality of its work. To make the boiler run time regular inspection and maintenance, but also to the boiler outage for maintenance, so as to guarantee the normal operation of the boiler when used again in order to maintain a long service life of the boiler. During operation of condensing boiler plant for a variety of factors will result in an exception of equipment failure, operator of proper operation and maintenance of equipment is the basis for stable operation of the condensing boiler, the timing should be for manufacturers of professional technical support personnel to detect maintenance, comprehensive training for operator so that the operator can make timely protection device when abnormal occurs.

Gas-fired steam boiler with asme certificate overpressure fault Introduction and approach: 1, boiler overpressure phenomenon of a sharp increase in vapor pressure, exceeds the allowable operating pressure, the safety valve pressure gauge pointer over the red line pressure is still elevated. b. When the interlock operation overpressure protection device, an alarm should be issued overpressure signal to stop the air blowing, the wind, coal. C. steam temperature and steam flow rate reduction increases. 2, boiler overpressure of emergency a. Weakened rapidly burning, manually open the valve or bleed valve. B. to increase the water supply, while the lower reinforcing blowdown drum (It should be noted at this time to maintain the normal water level of the boiler), in order to reduce the temperature of the boiler water, thereby reducing the pressure in the boiler drum. c. If the safety valve pressure gauge malfunction or all of the damage, emergency shutdown, safety valves and pressure gauges are to be repaired after the boost operation. D. When the boiler and endanger the safe operation excessive pressure, blood pressure should take measures, but too fast buck is strictly prohibited. e. When the boiler overpressure eliminate serious, to the shutdown of the boiler internal and external inspection, to eliminate the overpressure caused by deformation, leakage and other safety accessories and repair failed. News / hot water boiler knowledge

The coal-fired water tube steam boiler with asme certificate water flows in the tube, and by absorbing heat, the water temperature is continuously increased to produce steam.