Tel No. (+86) 371-55629010

boiler manufacturers kochi

The basic criterion gas boiler manufacturers kochi operation is safe and stable, how to ensure the safe operation of the boiler, boiler room need to start from the construction and operation of the boiler, specific requirements are as follows: 1, boiler room enough to stay safe passage, and, to be taken outside the boiler door apart manner; 2, the boiler room is provided to the gas leak detection devices, the time monitoring operating conditions of the gas; 3, the boiler room is arranged to meet the fire safety requirements; 4, the boiler operating temperature and pressure can not be too high; 5, gas boiler the water level must not run too high or too low, to be controlled within a predetermined range.

High Steam Pressure: ZG manufactured gas fired power plant steam boiler manufacturers kochi’s steam pressure can reach to 3.82 MPa

Flexible Burner Layout: Gas fired power plant steam boiler can use fuel like natural gas, city gas, etc

Since last year, the city of Yinchuan in Ningxia to develop clean energy alternative to coal heating work carried out, in order to adhere to the use of waste heat energy-based heating system, two years, a total removal of 212 coal-fired boiler manufacturers kochi units, designed over 20 million square heating area Meter. At present, Yinchuan City, the formation of a waste heat recovery and cogeneration-based, clean energy co-existence of a new pattern of heating, coal heating gradually withdraw from the stage of history.

According to Yinchuan City Housing Construction Bureau feedback, early last year, Yinchuan City, began to promote the implementation of "East of the West to give a" heat of long-distance heating projects, the long-distance transmission projects across the Yellow River, the basic realization of restructuring heat source, heat source interconnection point to ensure the city heating security and stability, environmental protection is of great significance.

At present, "East of the West to give a" central heating heating net charge of the project, the city branch, etc. have been completed, the east, the city water pipe network has been completed and started flushing cycle, is west of the water, water totaled 145,000 cubic meters.

At the same time, Yinchuan City, also build a heat source, thermoelectric Xixia complete the second phase of construction, the new 2 sets of 350,000 kilowatts supercritical coal-fired air-cooled heat generators, which can effectively replace Yinchuan City, 154 small coal-fired boilers, the annual generating capacity 3.85 billion kwh, heating capacity of 16.42 million square meters.

This year Yinchuan new cogeneration district heating area of ​​41 million square meters, the new heating pipe network 86 kilometers, is the largest investment project ever central heating, with the largest of the year.

imported burners provide a wide operating range

central furnace tube to ensure safety and long life of the steam boiler shell