Tel No. (+86) 371-55629010

powar plant in maharstrasecond class boiler oparetar

Before the opening, Xiao Bian would like to ask you, for the "powar plant in maharstrasecond class boiler oparetar" the vocabulary, what concept? Heavy shell? Dark boiler room? Or the dusty it? In the fast boiler, all this will be broken. Into the fast side, the first thing is 120,000 square meters of factory area, 6,000 square meters of clean boiler test center, you will inevitably get lost. But now do not worry, we launched a corporate panoramic VR, sweeping away mobile phones, travel all know.

The responsibility of Fangkuai powar plant in maharstrasecond class boiler oparetar installation project quality manager (1) is responsible for the implementation of technical standards and quality system documents of boiler installation engineering, (2) responsible for organizing and compiling construction organization design, construction plan and other technical documents. 3) responsible for the quality record of the project to meet the prescribed requirements; 4) to lead the work of the professional responsibility personnel of the project and coordinate the cooperative relationship between them, have the right to deal with the disputed quality issues and report to the representative of the quality assurance engineer or manager; 5) implement regulations, norms and standards related to boiler product quality; 6) organize project pot The operation of the furnace installation quality system, coordinate the work of the relevant functional departments and professional responsible personnel of the project quality system, 7) according to the contract requirements, combined with the characteristics of the project, determine the work quality objectives and requirements; 8) grasp the engineering quality information, feedback to the relevant professional responsible engineers in time, constantly improve the work to ensure the quality of the project.

calculations of powar plant in maharstrasecond class boiler oparetar efficiency

The effective heat utilization of the boiler per unit time as a percentage of the heat input to the boiler, or the percentage of effective heat used per kilogram of fuel (solid and liquid fuel), or the input heat per standard cubic meter (gas fuel) Thermal efficiency is an important technical and economic indicator of the boiler, which indicates the perfection and operation management level of the boiler equipment.

(E) a production equipment and tooling. Semiautomatic or automatic cutting machine to be cut thickness to meet the needs of a Class A powar plant in maharstrasecond class boiler oparetar production. 2. Bending device should be able to meet production needs. 3. The product should be compatible with welding equipment, including automatic submerged arc welding machine, gas welding, arc welding machines. 4. Shall sheet and tube welding groove processing equipment and products to adapt. 5. Heat treatment equipment header should be compatible with the product. 6. Drilling equipment and products should be compatible. 7. It should be not less than the machining diameter of 2000 mm vertical lathe. 8. There should be blasting or sandblasting equipment. 9. Machining apparatus having a specimen processing and meet production needs. 10. Tooling boiler has to meet production needs. 11. A-class boiler manufacturers should have at least four of the following major equipment: (1) the ability hydraulic press or hydraulic press no less than 2,000 tons. (2) having a heat roll (pressure) furnace 100 mm thick steel plate. (3) Bending coil having a capacity not less than 100 mm thick. (4) a heat treatment apparatus having a drum with not less than 50 megawatt class A product adapted. (5) having a membrane wall production equipment and products compatible. (6) The tube bending apparatus having a row and to adapt the product. (7) having a serpentine production equipment and product compatible. (8) a tube or a group of the overall heat treatment furnace tube panels.