Tel No. (+86) 371-55629010

waste recovery

The main components of the pharmaceutical factory waste recovery What? The main components of the pharmaceutical factory boiler What? As the market continues to open up the boiler, the boiler is also a range of pharmaceutical applications more widely, so there are many users the main components of the boiler is not clear, the following Xiaobian take you to do a simple understanding. (1) the furnace to ensure a greater degree of combustion of the fuel can, while maintaining the temperature of the flue gas outlet may be cooled to meet the value of the status of the convection heating surface safety. (2) the storage drum drum soda, it can adapt to changes in load, while means provided inside the steam-water separation to guarantee the quality of soft drinks. (3) The fuel combustion apparatus and its desired combustion air into the furnace and ensures that the fuel can be balanced, stable combustion. (4) using the air blowing device blowing the air after the apparatus through the heating equipment to a furnace for transporting preheated applications. (5) in the furnace wall during use of the boiler, the boiler acts as insulation and sealing. Of course, the main component is far more than pharmaceutical boiler associated components described above, as well as economizer, an air preheater and the like, in terms of the main components of pharmaceutical boilers, have some knowledge, a reasonable selection will Boiler and so we have a better effect.

6 tons of gas steam waste recovery start / ignition / boost a description, unit 1 starts, the boiler starts to open the first draft fan. 2, the induced draft fan starts normally from about 1 to 3 minutes blower opening. 3, starting Cleaner. 4, rotation of the grate, and adjusted appropriately stalls second ignition 1, ignition starts after all the examination was normal, the amount of wind and the wind blowing good after normal combustion seam to be adjusted to maintain a certain furnace pressure (-15 ~ -30Pa ). 2, when the temperature is increased Stokes is not too fast, the time from ignition to supply the steam required for less than 2 hours. 3, when the air vent has steam coming off when air vent. Third, the booster 1, when the boiler is boosted to 0.1 ~ 0.2MPa, to the flushing water pressure gauges trap. 2, when the boiler is boosted to 0.2 ~ 0.3MPa, to check every one hole, hand holes, valves and other leaks, if the screws are loose (if the screws are loose, the screw must be tightened). 3 when the boiler is pressurized to 0.3 to 0.4MPa, sewage drain valve open time of the drum, reducing the temperature difference between the upper and lower drum to promote water circulation. 4, when the drum steam pressure gradually increased, the components of the boiler to be noted that there are no special or abnormal sound occurs, if the above anomalies, should immediately check, shutdown can check, if necessary, until the fault is cleared before continuing 6 run. 5, during boiler Stokes, economizer outlet water temperature must be monitored to prevent moisture inside of the economizer, economizer valve leading to the drum can be closed if necessary, open the economizer recirculation valve leading to the tank, of water economizer alone, but before the steam supply to return to normal position, to prevent water shortages.

After the party soon receive an invitation, we attach great importance to this work, and the exclusion of professional and technical personnel around the waste recovery safety, the contents of energy saving measures, water quality management equipment, load matching programs have been carefully prepared. After the training, all enterprises and institutions representatives have said that through this training to learn a lot of knowledge of the safe use of the boiler, benefit, will do the safe operation of the boiler in accordance with the guidance of experts.

How much pressure hot water waste recovery pressure hot water boiler as long as the current is concentrated by heating in the hotel industry and the industry, because these two industries are currently need to use very large amounts of hot water, especially for the heating industry needs hot water is even greater. In this regard, as these two sectors, then the procurement of pressure hot water boiler, must be combined with the actual situation of each boiler plant of accounting, but also to go through a wide range of contrast. Recently, there is a fast boiler heating companies to consult, want to buy several pressure hot water boiler for district heating, but heating area just know their own data, but for the tonnage involved on the required number, the number of and the cost of procurement is not very understanding. Technical staff want help fast Boiler accounting after accounting, concluded that the need for heating heating companies with three 10-ton pressure hot water boiler. At present, the model is about 1.4 million. The cost of purchasing a total of about 4.2 million. Therefore, the heating company for how much pressure hot water boilers already have a detailed understanding.