Tel No. (+86) 371-55629010

General Layout of a Thermal Power Plant

April 8, 2019 China International Corrugated exhibition in Shanghai New International Expo Center, such as about the opening. Fast general layout of a thermal power plant as China's "most influential brand of industrial boilers," was invited to participate in the exhibition.

Fast side gas condensing general layout of a thermal power plant which features the characteristics of a gas steam boiler 1, steam boiler burner gas supplied by well-known manufacturers in the world, according to the automatic combustion controller instructions, stop, separate control box has a number of security, safety and stable performance , low maintenance; 2, advanced automatic steam boiler controller, Chinese LCD screen, the man-machine interface, the user simply easily set, i.e., according to user requirements boiler start and stop, load adjustment, automatic water supply, such as automatic operation . Boiler fully functional, complete protection, easy to operate, safe, reliable, self-diagnostic function. Once the boiler operation automatically interrupt abnormal combustion, audible alarm occurred; 3, vertical steam boiler burner set under way, double return configuration, fuel combustion, boiler stable; inserted spoiler smoke tube, slow exhaust rate, increased heat transfer, a high thermal efficiency, and reduce cost; 4, horizontal steam boiler shell type three return all wet back downstream pyrotechnic tube structure, economy, and waveform furnace threaded pipe structure and improve the strength of heat absorption of the boiler, the heating surface needs thermal expansion; 5, strictly in accordance with the present boiler "steam boiler safety supervision", JB / T10094-2002 "industrial boilers general technical conditions", JB / T1619-2002 "boiler shell boiler manufacturing technology conditions" requirements, design, manufacture, inspection supervision, to ensure good quality of boilers, achieve low energy consumption, high thermal efficiency, stable pressure, gas and quantity, the economic use; 6, furnace boiler space, the steam storing more adaptable load capacity, the rational design of steam separator apparatus built to meet the user's need to use high quality steam to the furnace body Open manhole, head holes, hand holes, to facilitate the internal furnace to clean up, make repairs, maintenance is very convenient; 7, with a multi-stage boiler safety interlock protection: protection pressure switch (pressure higher than the set alarm and automatic shutdown ), low water protection (the body of the boiler water level is below the warning level, the alarm and automatically cut off power), the protection valve (boiler pressure exceeds the working pressure, automatically deflated down), under various conditions to ensure foolproof boiler, home security ; 8, mechatronics combined organic appearance, new sophisticated, compact, less space, easy to transport and install; 9, insulation materials and the use of new high-quality white color plate package, lighter in weight, good insulation performance, aesthetics generous, not rust; 10, automatic / gas steam boiler is widely used in hospitals, schools, textile mills, garment factories, clothing stores, garment factories, dry cleaners, restaurants, hotels, bread stores, hotels, cafeterias, restaurants, food plants, beverage plants, soybean plants, meat plants, canneries, wineries, pharmaceutical, packaging factory, building materials factory, paint factory, beauty salons, Bath center, sauna, steam room, baby swimming pool and other enterprises place.

30 ton CFB general layout of a thermal power plant manufacturer in China

ZG is really a preeminent 30 ton CFB boiler manufacturer with experience of almost seventy years. ZG have developed an unmatched higher level of expertise in fuel combustion by designing, manufacturing and supplying state-of-the-art systems and equipment that actually work cleanly, cost-effectively and reliably.

A correct steam general layout of a thermal power plant shutdown: 1, the steam boiler is not used to determine, fireman and support staff to coordinate Division, before proceeding shutdown operation. 2, to reduce fuel (coal), and then reducing the amount of wind, until after the load falls to zero, closing the main valve and stop the air blowing, the wind is stopped after 5 minutes. 3, the shutter closing the flue, each door seal, manholes. 4, the boiler flame, when the vapor pressure exceeds the working pressure, exhaust valves should be opened or add water to the boiler and the blowdown, but should not significantly cooled boiler. 5, boiler pressure is not reduced to zero, to maintain the normal water level, the operator may not leave their posts until the pressure to zero, then make sure all links are correct before they show proper steam boiler shutdown.