Tel No. (+86) 371-55629010

simple operation hot water boiler

2, auxiliary configuration, such as configuration of the auxiliary level, load and manufacturers;

3, boiler manufacturers to their own circumstances, such as construction time, brand awareness and so on.

Preparations before the oil-fired boiler oil-fired boiler ignition is not just any work can ignite it, need to do some preparation before ignition for everyone's safety, usually before igniting we will do six kinds of preparatory work that is. 1, fuel gas pressure is normal check, pipeline valve leaks, the switching valve is in place. 2, the test fuel gas reliable alarm system is working properly, the fan can start pressing the test button. 3, check the fuel boiler water softening system is normal, is working to ensure that the water softener, water tank level is normal. 4, check the boiler, the switching valve is normal decontamination. 5, 6 deaerator normal operation, water softening equipment can operate normally. Demineralized water should meet the standard GB / 576, the normal water level inside the water softener, water pump trouble-free operation. Above is the preparation work before the oil-fired boiler to ignite hope for your help, of course, more questions, please contact our online customer service.

In addition, a suitable burner for the combustion boiler is adjusted to improve the material, steel materials excellent in the proposed selection, and adding wear resistant function, to use high temperature cyclone also afraid of stainless steel, to avoid due to spin burning nozzle vanes deformation damage falling combustor configuration.

Recently, Dezhou City, Shandong Province, has released the main points of pollution prevention and control in 2019, set specific targets and implement measures to control emissions of persistent pollutants SO2, NO2, to reduce the number of aspects such as severe pollution days.

1, continued to promote the total coal consumption control. Strictly implement the coal consumption reduction, equivalent alternative policy requirements. Continue to implement the monitoring and early warning mechanism to control the total amount of coal, coal consumption for the counties (cities, districts) were scheduled monthly, quarterly analysis, forecasting and early warning and timely release. Refined coal decomposition control mission objectives to ensure the completion of the annual total coal consumption control tasks.

2, strengthen renewable energy development and utilization. Actively promote wind, solar, biomass, geothermal and other renewable energy sources, promotion of power generation, industrial and residential heating and other heating applications. Achieve renewable energy consumption accounted for the proportion of primary energy consumption of more than 15%.

3, continue to promote the management of coal-fired boilers. The existing 35 tons of steam coal-fired boilers, according to ranking policy before the end of 2019 included in the phase-out plan. The inclusion of out of range, to ensure that out of the task before the end of 2020.

4, the implementation of low NOx combustion gas boiler reconstruction. To 2020 basically completed the transformation of low-NOx combustion as the goal, listing the existing inventory ledger gas boiler, to determine the transformation of an object, complete renovation in 2019 total about 50%. After transformation of NOx emission in principle higher than 50mg / m3. Achieve a stable concentration of nitrogen oxide emissions rebuilt 30mg / m3 or less (that is, ultra-low NOx combustion requirements) can be appropriate priority in provincial subsidies make up ecological civilization prize funds.

5, continue to promote clean coal. Strengthen clean coal production, supply, construction and distribution system, and continue to improve the implementation of the subsidy policy, to ensure the timely distribution in place to protect the people warm winter. Bulk coal market to strengthen the comprehensive improvement of law enforcement, the implementation of three coal detection mechanism to prevent inflow of low-quality bulk coal, clean coal to ensure quality standards. 2019, on the basis of full coverage in clean coal, continue to promote clean coal.

6, strengthen high-pollution fuel combustion zone ban construction. Combustion zone ban, a ban on new or expanded high-polluting fuel burning facilities have been built to the deadline to switch to clean energy. Investigate and punish illegal construction, expansion and high-polluting fuel facilities are not completed within the prescribed period rectification behavior. Ban on burning coal for a total ban on the circulation area.

7, continue to promote clean heating transformation. To proceed from reality, should the electric power, gas should the gas, the coal should be coal, should be hot is hot, warm winter to ensure the safety of the masses. Accelerate the pace of production, supply and storage of natural gas marketing system construction and gas storage facilities, improve air support capabilities. To develop multi-gas source, priority for clean heating, ensure safe and stable gas. Strengthen heating, gas facilities construction, expanding the central heating, gas, geothermal heating coverage. Accelerate the clean heating renovation project, before November 15, 2019 to complete the annual task of transformation goals. Complete power-generation coal, gas and other clean coal generation of heating transformation of the region, a total ban on bulk coal sales, to prohibit the sale and hoarding bulk coal, bulk coal to prevent the re-burning.