Tel No. (+86) 371-55629010

Natural gas fired steam generator for sale

Central heating hot water boilers for heating in winter is an important measure in most parts of China. Hebei Guan China Fortune Foundation Limited mainly engaged in real estate projects, is a leading industrial town operators. Heating service is primarily aimed at the Group's residential housing and other real estate. With the full open sky Battle, continue to improve the proportion of clean heating, heating for the implementation of clean energy, China Fortune Foundation to purchase much-needed high performance hot water boiler clean and green products. After comparing a number of boiler plants, the best of the best, determined to cooperate with the fast boiler in abundant clean energy R & D experience in boiler party. Providing fast boiler SZS Series 2 gas hot water boiler according to the actual needs, respectively 58MW and 29MW.

What needs to pay attention to low-carbon transformation of the boiler there? Compared to ordinary low-carbon boiler boiler, it is much more environmentally friendly, so I chose to use a low-carbon economy to be more environmentally friendly boiler, then, to use the technical transformation of the boiler low-carbon, low-carbon transformation that the boiler when what ? attention to the needs of today it Yuyao Kai large fired steam generator for sale boiler manufacturers are concerned that low-nitrogen transformation of those things: 1 gas burner ignition fails the second consecutive time, should stop to check the gas supply system, the burner has occurred normal circuit wiring is correct, after the lifting of the fault before restarting the burner. 2. The supply line is prohibited or metal rod with a wrench percussion, friction, to avoid static electricity or sparks, causing a gas explosion. 3. In the non-gas manifold or pipe smoking, etc. flange, welding, cutting and other illegal operations. 4. prohibited any open flame test next to the pipeline and valve block and pressure regulator, to avoid a major accident. 5. In the gas supply line, is carried out evacuation, but the residual wall gas or liquid droplets, in case, electrostatic sparks and flame also cause fire and explosion. 6. When the air supply has the same period, and when disassembling valve failure, it shall be first distal manifold valve, then the valve to the manifold to the total length of tubing in which the gas is vented before it can be disassembled with the valve service. 7. prohibit the use of non-explosion-proof electrical power tools in the field. Leak valve 8. A device must be checked before use. 9. Before burner start, the supply pressure testing must be done to check for leaks, after confirming normal, then a simulation run. 10. When the burner is not used to inform the customer off power supply main valve and the main switch. 11. Not recommended for debugging night burning machine. 12. At the end of commissioning, to organize training of operating personnel to use the operating direction, establish operating procedures, if necessary. These are some of the issues of low-carbon transformation of the boiler should be noted that, in order to prevent danger, should strictly follow the precautions execution, where the checks have checks in place, there can be no negligence, to complete the renovation project of low-carbon boiler.

Details of boiler water quality standards: The main fuel boiler plant is converted to steam having entered a certain heat, hot water or steam boiler may provide the required thermal energy generated directly industrial production and the people's living, the steam power plant can also be is converted to mechanical energy, or through the generator converts the mechanical energy to electrical energy. Used for power plant boilers, ships, locomotives and industrial and mining areas.

Detection of gas steam boiler and test methods for precautions gas steam boilers and pressure vessels and piping, with the continuous progress of the times, the use of fuel combustion boiler is released by heat or other energy to heat water or another working fluid to produce specified parameters quality steam, hot water or other working fluid devices are widely used in organs, institutions, businesses and industries. At present, the Chinese economy undergoing rapid change, the boiler industry is more prominent, and technical performance close to the level of developed countries, formed the independent development of generation after generation capability of new products. Boiler is the economic development of the times indispensable commodity, and once the boiler in use, generally require continuous operation, can not be arbitrarily disabled, otherwise it will affect the production and life of the production line or area, so the boiler, the safe operation of pressure vessels is very worthy of study of. Boiler or heat using a fuel other sources of water can be heated in hot water or steam machinery. Pot original meaning refers to containers that hold water heated on the fire place burning stove refers to fuel, boiler and furnace boiler consists of two parts. Generating hot water or steam boiler may directly provide heat required for the industrial production and the people's life, by a steam power plant can be converted into mechanical energy, or through the generator converts the mechanical energy to electrical energy. Provide hot water boiler hot water boiler is called, is mainly used for domestic, industrial production also have a small application. Boiler steam is known as steam boilers, often referred to as boiler, used for power plant, ships, locomotives, and industrial and mining enterprises. First, the test content and methods of pot seized pot seized center and stood responsibility boiler and pressure vessel installation supervision and inspection of the whole network is the main purpose of the inspection work carried out by the installation, the boiler and pressure vessel crew statutory inspection fell at all. In the supervision and inspection work, the installation of Supervision and Inspection of pot seized center, strict implementation of the various companies of pot seized the station state and industry regulations and standards, the implementation of test plans and implementation programs, implementation, etc. quality assurance system played a supervision, promote and improve role. Many problems found at the scene, assess test results and play a guiding role for supervision and inspection of processing problems found. Boiler and pressure vessel and pressure pipe installation involved in the process of their projects safe operation of inspection and boiler pressure vessels and pressure piping installation units installed functioning of the quality assurance system to check the contents of Quality Supervision, Inspection of boilers and pressure vessels and pressure pipes. Content and external inspection methods, internal inspection and hydraulic test 1. test gas steam boiler pressure vessels and piping is the main content of the periodic inspection of the boiler. Pressure vessel and self-check items: including manufacturing data, construction data, safety accessories, protection devices, the appearance quality, the device designer, the support, the expansion pipe, the installation checks weld inspection, hydrostatic testing, installation weld appearance, insulation, platforms, escalators. Pressure pipe and a self-test program: including technical information, the pipeline route, slope, creep bulging measuring point, the position of the monitoring section and hangers, the appearance quality of the pipe, pipeline installation weld quality, weld quality hanger installation, pipe expansion hydrophobic conditions, hydrostatic testing, creeping inflation measuring point measuring the radial distance, creeping inflation measuring points on both sides of the pipe outer diameter or circumference measurements, pipes, drainage system installation. (1) external inspection. External inspection refers to the inspection, external inspection of gas steam boiler steam boiler operating state of the security situation boiler is generally one year. In addition to the normal external inspection, some of the following circumstances should also be external inspection: When reassembling the boiler began to put into operation; recovery boiler stop running when you run more than one year; after the combustion and boiler safety automation system has changed. (2) internal inspection. Internal inspection refers to the inspection of the steam boiler boiler security situation in the state shutdown, internal inspection general inspection every two years. In addition, when there are special circumstances, it should also be an internal inspection. (3) pressure test. Pressure test is a test pressure in the boiler water as a medium, a predetermined test pressure of the boiler and the strength member for receiving tightness. General hydrostatic test once every six years, the boiler can not be internal inspection shall be conducted every three years water pressure test. Hydrostatic test failed boiler must not be put into use.