Tel No. (+86) 371-55629010

hot water biomass pellet fired boiler

Boiler "four" leakage phenomenon determines: whether the output of hot water, steam or thermal oil, and regardless of using coal, oil, gas, biomass or power hot water biomass pellet fired boiler, has the following "four", respectively, of boiler waterwall tubes, superheater tubes, reheater tubes and economizer tubes. It covers all four pipes of the boiler heating surface, the internal pressure of the working fluid bear, may be external to bear the high temperature, harsh environment corrosion and wear, excessive reconcile between water and fire, where the energy is concentrated is passed .

Wood Waste Biomass Water Tube CFB Boiler Challenges

In spite of the advantages of biomass firing, it also faces many challenges as a main means of wood waste biomass utilization for water tube CFB boiler.Fouling and slagging threaten the economy and long-term operation security of wood waste biomass water tube power plants. For example, some newly built power plants in Northern China have to shut down and clean the boiler every 20–30 days because of slagging in the intermediate-temperature superheater.

Use should pay attention to the problem of steam hot water biomass pellet fired boiler pressure gauge. Rated steam pressure of less than 2.45MPa steam boiler, a manometer accuracy no less than 2.5; equal to the rated boiler steam pressure 2.45MPa, the pressure is not less than 1.5. Dial gauge diameter of not less than 100 mm, to ensure that the operator can clearly see the surface pressure indication. 2. Steam boiler gauge plate should draw a red line that indicates the maximum allowable working pressure. 3. The steam boiler pressure gauge should be installed in place to facilitate the observation and purged, and should prevent high temperature, vibration and icing. 4. The steam boiler pressure gauge should be checked at least once every six months, after calibration seal should be sealed. 5. The steam boiler gauge connection tube not leak water and steam, otherwise it will reduce the pressure instruction value. Biomass boiler is a kind of boiler to biomass energy as a boiler fuel called biomass boilers, steam boilers into biomass, biomass hot water boiler, biomass stove, biomass thermal oil heaters, vertical raw biomass boilers, biomass boilers and other horizontal. Steam boiler is an energy conversion device, the energy input to the boiler fuel chemical energy, electrical energy, thermal energy and other forms of high temperature flue gas, and after converting the boiler, the steam output having a certain outside thermal energy, high-temperature hot water or an organic carrier. 6. A steam boiler pressure gauge measuring range should be compatible with the operating pressure of the device under test, the working pressure is generally 1.53 times, preferably 2 times the working pressure. Steam boiler no pressure gauge, pressure gauge or pressure gauge damage does not meet the requirements. When the steam boiler pressure gauge of the following circumstances, should stop using: 1, the surface of the glass broken or blurred dial; 2, lead-free seal, lead seal is broken or exceeds the calibration cycle; 3. When no pressure gauge pointer position is limited to the limit staple nail can not be restored, and the unlimited gauge pointer from zero rank bit data is out of range pressure layer. Difference; 4, leak or pointer jump table; 5, other defects affect the gauge accuracy.

From March 18 to start, Lujiang County, Anhui Province north of the Market Authority on the area of ‚Äč‚Äčinternal security to carry out a special inspection of hot water biomass pellet fired boiler pressure boiler; To ensure the safe operation of this special equipment, complete elimination of security risks.

The inspection mainly troubleshoot and eliminate hidden dangers in the management and operation of the boiler links exist, focus on examination of whether to establish safety management systems and procedures; whether to set security management or part-time security management staffing; whether workers with valid work certificate for employment; boiler operating records, inspection records and shift recording is complete; if the boiler for the use of registration; whether the inspection within the validity period; check valve is within the validity period, the pressure gauge whether the test within the validity period. Up to now, law enforcement officers dispatched 27 people, focus on examination of 12 times the focus of special equipment supervision units, hospitals, schools, boiler 20 times, do not meet the specified use in accordance with the boiler "Special Equipment Safety Law of People's Republic of China." requirements, issued a supervision instructions, requires immediate rectification unit, for there is no regular inspection of boilers or unqualified, shall not be put to use.