Tel No. (+86) 371-55629010

thermax boiler 14 tan pn id 1992

Gas steam thermax boiler 14 tan pn id 1992 installation What are the requirements? Buy gas steam boiler to consider the size and nice and beautiful to consider the size of the effect, choose a white color board packaging when purchasing natural gas boiler, it will not only look beautiful and generous with this insulation effect white color board packaging is very good. There is the problem of the size of the volume of natural gas boiler, can be placed in the position you placed this demand is important, assuming the purchase of oversized probably too small, the impact will form a beautiful together some unnecessary trouble . The primary effect and explain the advantages of gas steam boiler: first we should know that the primary effect of natural gas boiler is for us to supply heat, so buy gas boiler division should want to see the surface of the packaging material. Select the division try to choose whole body is made of glass wool, glass wool due to the insulating effect of this material is very good, and very light weight. As a result there is a lot of heat in the boiler division will not lose, once the heat in the boiler will not be able to quickly lose more heat energy supply we need for us, the working efficiency will rapidly decline, but also waste more fuel. Gas-fired steam boiler is the first commercial water boiler, water district, but in recent years boiler explosion incident and the extent of corrosion in the boiler point of view, a lot of steam boiler hot water boiler worker for the protection and use of mechanical and electrical record is not very understanding, perhaps less cooked. 1. The device must be installed for the skills required device unit power before the unit, a device construction organization plan and develop network solutions unit construction. Engineer skills tests, shall be carried out according to the specific circumstances of the organization pumping station planning, manufacturing, construction units, coordinate with each other. Construction organization planning device after securing approval, issued by the chief supervision engineer started to make construction unit before playing a device construction. Construction should be set up organizations, to establish who is responsible for individual projects, the scale of responsibilities clear, unified command. Unit personnel to seriously study skills materials, familiar with the drawings, grasp the rules, norms and regulations related skills, to grasp the device processes, methods and requirements, so that means satisfactory quality planning requirements. 2. The device is applied to the primary embodiment of an apparatus operation part industry. Include: a process means, operating means schedules the like. Device program should clear the construction sequence and construction schedule, the entire project is listed in the individual projects, division of engineering and engineering, separation of primary and secondary, first, after then arrange reasonable time limit, staff and the various stages of construction the primary task of the construction progress of the project can be both before and after, coordinate with each other. Steam boiler main requirements are as follows: 1, when the evaporation amount is equal to the rated boiler 6t / h should be oxygen, less than the rated evaporation 6t / h boiler found localized corrosion, feedwater oxygen measures should be adopted, for steam for the steam turbine boiler feedwater oxygen content should be less than equal to 0.05mg / L. 2, as determined when the dissolved solids is difficult, the conductivity measurement method may be employed or chloride ions (C1) controlled indirectly, but with the conductivity or dissolved solids and a ratio of a chloride ion (of Cl-) should be based on test confirm. And should be regularly re-examination and revision of this ratio relationship. 3, the structure of all-welded boiler may control the relative alkalinity. 4, rated evaporation amount is smaller than 2t / h, and less than the rated steam pressure of steam boilers and hot water boilers soft drinks dual equal to 1.0MPa (such as steam, water quality no special requirements) may also be pot-treatment. But we must strengthen the supervision of scaling, corrosion and water steam hot water boiler, earnestly dosing, sewage and cleaning operations.

The party hot water thermax boiler 14 tan pn id 1992 output fast enough to provide high efficiency, give us save a lot of fuel costs, and exhaust gas discharged tested in full compliance with environmental regulations on emissions of air pollutants in Henan Province. Fast boiler responsible attitude also left us with a deep impression, overhaul maintenance problems for a number of aspects of boiler operation and post, sent a very professional technical staff and our butt, fireman guide our people, for the quick sale of party, we are also very satisfied. --customer feedback

When the steam thermax boiler 14 tan pn id 1992 water shortage is serious, you can smell the burnt smell. From the door to see the red-hot water wall tube, tube may rupture, this time to hear the sound of blasting, steam and smoke from the door, watching the fire door ejection.

Many different types of thermax boiler 14 tan pn id 1992s and pressure difference between the pressure of the boiler, where the atmospheric pressure and a lot of applications, heating effect is also very good, for which we often confuse the two, is considered to be the same kind of equipment, in the end two whether the devices are the same? Here we'll tell you about the difference between the two: 1, pressure both to supply low-temperature water, but also for high-temperature water. And atmospheric pressure can only supply low temperature water of less than 100 deg.] C. 2, the water level control problems ① pressure is full of water, there is no level control problem. ② pressure of the water level control problems. The boiler drum is full of water, still connected to the top of the box opening, there is still water level control problems. 3, is not confined to the boiler equipment ① pressure of the heating system is pressure equipment, with a risk of explosion. ② atmospheric pressure boiler heating system boiler is not always open to the atmosphere so that the boiler will not explode in any case, good safety performance. 4, elements shall be installed differences ① pressure gauge, safety valve and thermometer, because the boiler always is full of water, so no water level and water level gauge ② atmospheric pressure is only a small thermometer, because the boiler with the atmosphere, the pot pressure is always atmospheric pressure, there is no danger of explosion, it is not necessary to install a safety valve, pressure gauge can not be installed. 5, a circulating pump heating system circulation pump and pressure difference ① is pumped from the boiler, the heat pump is the pump that functions to overcome the resistance of the system, mainly to overcome the resistance of the valve regulating backwater. ② pressure of the circulating pump heating systems, pumping systems engineering is sent to the boiler return water, is generally used in water pump. It has to overcome the resistance of the systemic circulation, but also to maintain a certain pressure boilers, boiler water at high temperature to ensure that no vaporization. It can be seen atmospheric pressure, the pressure of the boiler is not the same, the main difference between the two lies in the different heating system works, so we choose to pay attention to in the future, and they need to understand is the kind of equipment, do not buy wrong can not be used.