Tel No. (+86) 371-55629010

efficiency difference between low high pressure boiler

10 tph WNS gas-fired efficiency difference between low high pressure boiler project for SinopharmSinopharm is a professional and fast-growth pharmaceutical company that integrates R&D, production and marketing. It specializes in pharmaceutical chemistry, pharmaceutics, drug synthesis, drug analysis, pharmacology and biomedicine, and clinical fields. In the pharmaceutical industry, it is well-known that steam is one of the most important energy sources that pharmaceutical companies need for production. Steam is used for heating, concentration, drying and heat exchange in production. Because of production needs, Sinopharm Co., Ltd. has purchased two sets of 10 tph WNS series condensing gas-fired steam boilers from ZOZEN boiler and put them into production after installation and commissioning. This set of condensing gas-fired steam boiler can not only generate high-temperature saturated steam in the pharmaceutical process, but also can adjust the multi-range according to the demand for steam to meet the needs of different steam volumes in the pharmaceutical process.

Our company has been committed to using environmentally friendly, a paper manufacturing process cleaner way, so we paid great attention to environmental protection efficiency difference between low high pressure boilers and other properties in selected product when the boiler. The fast-party cooperation and boilers, our company is the right choice to make, party fast to the products we offer very environmentally friendly characteristics, and has high efficiency, for my company save a lot of costs. --customer feedback

Henan fast efficiency difference between low high pressure boiler with small series to introduce the company's operating pressure and fire precautions under pressure steam boiler operation and fire precautions steam boiler. Procedure 1. Fire pressure steam boiler (1) to reduce boiler load, according to the length of time of shutdown, the seam thicker, the thickness is generally not more than 200 mm, suitable to accelerate the speed of the grate. (2) to the slag is thickened seam about 1 mm from the stop grate rotation, the drum is stopped, the operation of the induced draft fan, blowing off a small segment of the regulating plate stopper and dampers qs, relying on natural ventilation to maintain coal the lean-burn, the sewage, boiler water level will rise to the maximum allowable level. If the fire burn coal gate, grate can be switched on again, the coal-fired back, a distance. (3) the recovery boiler needs to run, as long as the opening lead, a blower, to adjust the smoke, and the wind baffle plenum segment adjusting the opening degree of the shutter, the adjustment of combustion steam boiler seam thickness to be normal, start grate, can be restored run. 2. Note the use of a steam boiler (1) before starting Check power supply voltage, there are unusual circumstances water, close the drain valve opens the water supply valve, check whether the pump stuck, stuck if the pump, remove the fan cover, rotation of the motor shaft to the flexible state to boot. (2) When the steam boiler maintenance or replacement of parts, turn off the power to avoid live work dangerous. (3) electronic control box, pump motors and other parts should avoid damp water to prevent burning boiler should pay attention to keep clean. (4) steam boilers in accordance with quality requirements, when using the apparatus sure to install a water softener, the water softener is not used because the boiler may cause fouling, may cause serious squib, shortening the life of the boiler. (5) steam boilers Please note that when using sewage. And at least once a day with a discharge pressure of between 0.1MPa to 0.15MPa discharge may be prevented clogging of pipes, sewage should be properly connected, to guard against burns.

The estimated price of a 10 ton szs series water tube efficiency difference between low high pressure boiler with a pressure of 4.5 MPa is 530,000 yuan. The price of the WNS series fire tube boiler is higher than the price of the water tube boiler. The boiler quotation information will generally be attached to the price of the boiler body and the auxiliary equipment such as the burner according to the customer's needs.