Tel No. (+86) 371-55629010

project on locomotive boiler

Most project on locomotive boiler water as a heat transfer medium, the flow starts to heat up the water heated in the pipe, when the water temperature reaches a certain level turns to vapor, and then divided into the drum along the line, and then supplied with hot equipment.

How to achieve time-heating electric project on locomotive boiler electric boiler heating how to achieve time: 1, electric boiler heating timeshare partitions can effectively save operating costs. 2, the electrical heating boiler according to the requirements of different building, a different time period to achieve different building heating and antifreeze switching control, real-time adjustment of different building return water temperature and the room temperature at the heating period, to ensure that the heating temperature is relatively stable. 3, in the electric boiler freezing period, backwater collected in real time according to temperature, the control operation of the electric valve to ensure the normal flow system, save energy consumption; Depending on the system, energy saving rate of 12% to 40%.

Diqing in Yunnan Nonferrous Metals Co., Ltd. mainly engaged in Pulang copper mining, site selection, sales and other items. As we all know, in the copper smelting process, it consumes a lot of electricity and thermal power resources, which account for most of the hot water consumption. Combined with the actual demand Diqing company, to provide fast Boiler 1 stage electric heating hot water project on locomotive boiler of 2.1MW.

2, pay attention to control pressure

The presence of gas boilers running internal pressure, these pressures is to provide sufficient power to the various production facilities, however, if the pressure in the boiler too much can lead to danger, therefore, in the course of operation of the gas boiler must observe the pressure in the boiler, if we find the pressure reaches the limit load value is necessary to take timely measures.