Tel No. (+86) 371-55629010

Distributor 20t Oil Boiler Latvia

Diqing in Yunnan Nonferrous Metals Co., Ltd. mainly engaged in Pulang copper mining, site selection, sales and other items. As we all know, in the copper smelting process, it consumes a lot of electricity and thermal power resources, which account for most of the hot water consumption. Combined with the actual demand Diqing company, to provide fast Boiler 1 stage electric heating hot water distributor 20t boiler latvia of 2.1MW.

The circulating fluidized bed distributor 20t boiler latvias are offered with options for automated combustion of more than 50 different fuels, such as wood, strew, Bark, Bagasse, Beer lees, coffee grounds, rice shells, corn cobs, etc. The automated and ash handling, sophisticated controls, in such plants make such plants make such plants ideal replacement for expensive oil fired plants giving similar ease of operations.

When long-term disabled distributor 20t boiler latvia, furnace should pay great attention to external corrosion and maintenance problems. First, the boiler shutdown cooling, heating surface must be thoroughly cleaned and the fouling of the upper grate, the lower portion of the furnace ash. Then to maintain a certain degree of natural ventilation flue. In general, in order desiccant moisture should be placed in the furnace, flue. The quicklime as a drying agent, within the furnace or flue gas per cubic meter should be placed generally about 3kg. After placing all the ventilation should be tightly closed doors. After the change of lime powder to be replaced. Low-lying position as boiler room, ground during shutdown severe flood tide, often approach should be used and placed a small fire to dry desiccant combination. If the boiler shutdown a long time, after the complete removal of soot coated with an anti-corrosion red lead paint in oil or other metal surface furnace.

Industrial gas steam distributor 20t boiler latvia room planning considerations: industrial gas steam boiler room Planning Considerations What? Followed by the degree of technological progress from time to time, the rapid expansion of social economy, people's requirements for industrial gas boiler room planning have become more sophisticated. Now now, in the industrial gas boiler room planning there are still many achievements in urgent need of treatment, therefore, we have to enhance the learning and use of advanced planning practices and advanced technology, from time to time suspend the development and review of industrial gas boiler room planning, the industrial gas boiler housing plan is more suitable, safe, reliable and economical. 2, selection and use of industrial gas boiler at a reasonable selection of urban planning, boiler, environmental management and other mission boiler type is dropped purification, waste power, an important part of reasonable expenses. Set the cost of the boiler is one of the essential elements of when thinking of selection. Because the characteristics of industrial gas boiler itself, the boiler room and equipment to establish a more economical, should be used in high load industrial gas furnace heat boilers in order to reduce the volume of the furnace. Due to the absence of heating surface cleaner, slagging, wear results, the smoke may use a higher speed, reduced scale of the convection heating surface, convection through the rational placement control the industrial gas boiler capacity of coal-fired boiler with a more compact structure, dimensions small, light weight, in order to decrease equipment investment; supporting auxiliary boiler optional satisfactory work. Industrial demand for gas-fired boiler is not equipped with soot blowers, dust, slag and other equipment and fuel dryer slave device, and can save and land acquisition costs placed above equipment; the use of a gas pipeline walks as boiler fuel, not only no fuel storage equipment, supply calm and without prior preparation of fuel processing equipment, greatly simplified the trivial; civil engineering boiler room investment costs and other related costs will lower; no fuel storage, can save shipping costs, place and rest force. Boiler room non-essential equipment such as leak detection equipment for the surge equipment, measurement equipment, gas. Coal, oil, gas boiler three kinds of heat load in the opposite situation, a huge volume of coal-fired boilers, additional slack style drums, Fan, Java machine, dust collector, but also with storage of coal, slag heap place, It covers an area larger.