Tel No. (+86) 371-55629010

boiler catalog for 10 ton capacity daelim royal korea

When the gas hot water boiler catalog for 10 ton capacity daelim royal korea blowdown discharge techniques good compared to low load when the load of the boiler water level slightly higher vapor pressure boiler water circulating slowly, resulting in easy accumulation of dirt in the drum, the bottom of the collection tank, and the high vapor pressure high blowdown flow, to facilitate the discharge of dirt. Further, when the boiler blowdown must be provided for hand operation, the water level to be closely monitored to prevent the water preferably should be operated to maintain the sewage level again at around 60%. Drain valve open should be short intermittently every sewage quick-closing speed of the opening, causing the slag scale disturbances, thus repeated several times, the precipitate was suction rely possible to quickly meet at outfall, then concentrated discharge. To control the right time, not too long, usually once a sewage must be in the 30s of the time. If the discharge time is too long, the water content of soil furnace will be gradually reduced, so the effect of variation not only sewage, emissions have increased, not only a waste of energy, but also affect the boiler water circulation, and even burst pipe failure may occur. Observation of the given row after the flash tank vapor emission mouth, must touch the outfall temperature, and view given row Expander air outlet, in order to determine whether or not to confirm the drain valve is fully closed. Ruoyin debris stuck in the spool of the leak can be re-opened after a rapid close, if the issues shutting the valve wear and difficult, should strengthen surveillance, arrange repair or replacement as soon as possible, at the same time, should be prepared to shift on the record corresponding record, for subsequent inspection. In summary, the work of boiler blowdown, we must try to do a good job, both to ensure the smooth operation of the boiler, also can guarantee the life of the boiler.

Second, the method of reducing the temperature of the boiler catalog for 10 ton capacity daelim royal korea exhaust gas pathway

1, increasing the tail heating surface, i.e. the installation of the boiler economizer (or condenser) to reduce exhaust gas temperature.

Then, using a gas-fired boiler catalog for 10 ton capacity daelim royal korea, give users what good is it?

First, clean environment

Directly under the Central Government Offices Administration (referred to as the straight Authority) is the CPC Central Committee and subordinate units, are responsible for the CPC Central Committee and services for the organs and services, an important function of serving the people. Central Government institutions funds, finance, public service vehicles, the state-owned assets and real estate management, service management is responsible for the specified life of the party and state leaders as well as services related objects.