Tel No. (+86) 371-55629010

1t Industrial Cheap Boiler Tajikistan

Of course, a good 1t industrial cheap boiler tajikistan manufacturers also have a comprehensive after-sales service. When the boiler a security failure, can be early warning and alert the user to solve the problem in a short time, to avoid greater security and economic losses in a timely manner.

Instrument pipeline gas steam 1t industrial cheap boiler tajikistan installation requirements: high-temperature gas output through the steam boiler, high-quality steam to provide heat for the heating of heating and processing enterprises. When you purchase the appropriate gas steam boiler, when installed, the instrument for pipeline installation must pay more attention, which not only affects the overall appearance of the boiler, for stable operation can have a significant impact.

In October 2016, my company and the China Dunhuang International Hotel signed a ZWNSL2.1-1.0 / W-Y.Q vacuum condensing gas hot water 1t industrial cheap boiler tajikistan to provide heating and hot water for the hotel. The boiler implementing the response to the national policy of environmental protection requirements and local environmental protection departments on a series of low nitrogen emission standard boiler requirements, in terms of design, manufacture, installation and other sectors have strict checks to ensure that the boiler safe and stable operation.

Hot water 1t industrial cheap boiler tajikistan maintenance method which hot water boiler hot water boiler maintenance methods if poor maintenance during outage or maintenance, the harm is great. Thus, the boiler shutdown should first remove the drum, the angle circle header, the internal pipe and the external wall and smoke vertical boiler scale, slag and all dirt. Fouling and cleaning inside the furnace water wall tubes and convection inside the smoke tube Huigou and boiler maintenance should be performed. Around its maintenance methods commonly used the following two methods. 1, wet maintenance: taking with a sufficient concentration of the alkaline solution in contact with the metal surface of the boiler, the alkaline metal surface to form a protective film to prevent corrosion in the metal. Usually of NaOH, Na2CO3 or formulated as protective Na3PO4 solution (NaOH per ton of oven 8 to 10 kg of water was added, Na2CO3 per ton 20 kg boiler water, boiler water Na3PO4 per ton 20 kg). The specific method is: the boiler all valves, baffles, manholes, hand holes, inspection door is locked, then the good previously dissolved NaOH, Na2CO3 or Na3PO4 solution was added to the boiler, the boiler and then filled with demineralized water. Alkali concentration in the furnace is the water released alongside consistent water gas (mainly O2 and CO2), the furnace may be raised Microflame warming (warmed before, the air valve to open the boiler, without air valve, safety valve available Instead of or relief valve) boiling water into the furnace, so that a natural circulation boiler water. After completion of the air valve (relief valve or safety valve) exhaust gas, and then close the air valve (relief valve or safety valve), then turn off the fire. Boiler water once a week should test to ensure that there is excess boiler water alkalinity. If insufficient alkalinity, should be added NaOH, Na2CO3 or Na3PO4.2, dried maintenance: desiccant absorbs moisture, boiler holding surface drying, to prevent corrosion. Lime (CaO) or anhydrous calcium chloride (of CaCl2) are commonly used as a desiccant. Specifically, the following: After the inner and outer surfaces clean boiler, boiler with Weihuo drying, then open wooden box containing a desiccant into the drum, the header, and furnace flue. The amount of the desiccant is determined according to the volume of the boiler (with large lime, in the boiler 2 to 3 kilograms per cubic meter, if anhydrous calcium chloride, from 1 to 2 kilograms). Then close all valves, flapper, check door, hand holes and Manhole prevent intrusion of external moisture. During the maintenance of open manholes, hand holes and door on a regular basis. If the desiccant is invalid, it should be replaced.