Tel No. (+86) 371-55629010

3 ton steam generator biomass fired steam boiler |

Directly under the Central Government Offices Administration (referred to as the straight Authority) is the CPC Central Committee and subordinate units, are responsible for the CPC Central Committee and services for the organs and services, an important function of serving the people. Central Government institutions funds, finance, public service vehicles, the state-owned assets and real estate management, service management is responsible for the specified life of the party and state leaders as well as services related objects.

Coal fired steam generator includes an economizer, a steam drum, and the furnace with its steam generating tubes and superheater coils. Necessary safety valves are located at suitable points to relieve excessive boiler pressure. The air and flue gas path equipment include: forced draft (FD) fan, air preheater , boiler furnace, induced draft (ID) fan, fly ash collectors (electrostatic precipitator or baghouse) and the flue gas stack.

With the urban heating developing with a modern, large-scale, centralized heating trend, in 2009, the company bought two 116MW circulating fluidized bed boiler and two bearing generators 3 ton steam generator biomass fired steam boiler |, not only to meet the city construction of rapid development needs, and enterprises to embark on the road of development of cogeneration.

Small gas 3 ton steam generator biomass fired steam boiler | in the hotel building applications in daily production, how to save energy and reduce the emission of pollutants, reduce costs, increase economic benefits to the business, the real problem is getting attention, and gradually resolved. Shenyang is a hotel accommodation, offices, restaurants, stores in one large commercial buildings, construction area of ​​6 × 104m2. During the heating period, heating systems, domestic hot water steam system, laundry room used by the municipal heat supply network. After the heating period, domestic hot water systems, steam laundry prepared from 2 model white WNS8-1.25-YQ fuel steam boiler (heating of serving as backup boilers) for the steam, steam production of single 8t / h. Steam boiler room to the sub-cylinder (in the basement podium) linear distance is 200m, and specifications for the steam supply pipe DN250mm, Buried employed, the compensator 4 disposed manhole. Based on the actual measured amount of steam on the hotel, and the application of energy-saving small gas steam boiler in the hotel building were discussed. Selection 2 gas steam boiler us 2009 June 7 to July 1 for steam consumption for domestic hot water systems, laundry room were measured. Average pressure of 0.08MPa steam, hot water systems, laundry average daily amount of steam were 7.43,2.43t / d. Two systems together, the maximum amount of steam per unit time and the average amounts were 0.77,0.41t / h. From the measured data, daily 9: 30-11: 30, 15: 30-17: 00 cooking gas peak, the highest air consumption is 19.65m3 / h, the hotel into the household gas pipeline gas supply capacity of 95m3 / h. According to domestic hot water, laundry room two systems unit time summer highest steam consumption is 0.77t / h, should be used in a 1t / h gas steam boiler, its gas consumption is 76m3 / h. In actual use, reasonable arrangements for gas time, can fully meet the demand for gas gas steam boiler. From the above analysis, the steam production of the hotel is much larger than the existing fuel steam boiler steam summer practical usage. According to the measured summer daily expenditure of more than just fuel costs more than 3000 yuan / d. Underground layer may be mounted on a podium 1t / h gas steam boiler, steam lines since all indoors, and therefore low cost pipeline system, and reduce the emission of pollutants, environmental protection efficiency significantly. 3 gas steam boiler room design of the hotel podium underground over 3 floors, including the basement of the original generator set oil storage has been discontinued, construction area of ​​about 60m2, close to the basement exit ramps from the gas pipeline into the family 8m, after transformation, can be used as gas heating boiler room. Gas heating boiler heating system flow shown in Figure 1. Gas heating boiler to be mounted ventilation system, the ventilation normally not less than 6 times / h, accident ventilation of not less than 12 times / h, the amount of exhaust air volume should be slightly larger, so that the boiler room space maintain positive pressure, and the ventilation should be selected proof products. Gas heating boiler to be mounted combustible gas detection and alarm devices, combustible gas detection and alarm device to automatically signal when gas leakage occurs, the emergency shut-off valve closed and to ensure that no further leakage of the combustible gas. Water spray system shall be installed, and the sprinkler system in conjunction with the original. Gas heating boiler in order to prevent water from leaking into the premises are ground floor, the ground should boiler room waterproofing and drainage ditch, the concentrated water discharged to the ground floor drainage system pressure, into the room promptly [1,2 ].