Tel No. (+86) 371-55629010

coal steam boiler manufacturers central luzon

Mill coal steam boiler manufacturers central luzons to reduce pollution which method 1, leak checking and maintenance of protection: 2 mm steam leakage will cause energy losses of more than 10 tons of coal each year do? When you do not use it, you can turn it off to save energy. For water, steam and compressed air leak survey and routine maintenance, cost very little. 2, the non-contact cooling water in repeated use: Since the non-contact cooling water temperature and the quality is very good, it can be reused for desizing, scouring, rinsing and other processes. Three best source of cooling water is regenerated: sintering machine, a pre-link and compressor systems. The plant water recovery system may be installed, pipes, valves, storage tanks, and control systems. 3, reuse of steam condensate: textile mills require large amounts of saturated water vapor in the dyeing process, wherein a portion of the condensate is converted to its high temperature and purity. Water can be pumped back to the boiler to form a new steam. For those who buy steam from suppliers, or boiler is located away from the dyeing process, the condensate can be used as water washing or desizing. 4, pre-treated wastewater reuse Procedure collected bleaching, mercerizing machine, the water can be reused in other programs, there is no direct discharge of wastewater. 5, hot wash water is recovered from the hot gas in the dyeing process, large amounts of hot water are used to wash. Heat the washing water can be collected by the system plate heat exchanger to preheat the water to be sent to the next washing. 6, pre-screened coal enterprises should introduce screening spiral coal boiler technology to selection of raw materials. It is possible to improve the media tell the good, the bad quality of proportion, to avoid loss of small volumes of coal and coal calorific value. 7, maintaining steam traps traps can help maintain effective delivery of the steam plant. The valve is removed from the steam pipe and prevent further condensation water, so as to avoid heat loss and reduce fuel consumption. 8, pipe insulation pipes, valves and flanges, valves and flanges experience hot waste of resources, reducing efficiency. Steam delivery device insulated to prevent vapor loss is an inexpensive, energy-saving method of .9, the heat recovery boiler chimney smoke at a temperature of 360 deg.] C, and sometimes directly discharged into the atmosphere, there is no heat recovery. In fact, this heat can be used to preheat boiler water, steam or create a new steam system. 10, optimization of compressed air systems consume a large amount of compressed air in many parts of textile machines Mills. These instruments are prone to leakage, particularly in a threaded joint, rubber joints, valves, automatic regulator, the inflatable device and the old gasket. In addition, the use of compressed air pressure is usually based on the maximum pressure setting; reduce this pressure is feasible and would not have any negative impact manufacturing.

Auxiliary means configuration of the auxiliary boiler apparatus comprising a boiler fuel supply means, air blowing means, the wind means, water supply means, means ash, dust removal device, instrumentation, valves and other automatic control device. Today small to introduce a boiler with auxiliary devices. A boiler fuel supply role is to store, transport, supply of the fuel. There are coal, to the media devices (mill, of mill, and coarse powder separator and lose powder duct), and supply means (for the fuel heater and the like), a gas supply device and the like. Air blowing means which effect a treasure ah blower and duct, the grinding media and air into the furnace through the air preheater apparatus. Blower apparatus, comprising a draft fan and the smokestack, speaking furnace flue gas to exclude air sent. Water supply means comprises a water tank, water supply pipes and water treatment equipment, boiler feed water away. In addition to ash means ash comprising artificial addition, other mechanical ash, ash in addition to water, in addition to the negative pressure pneumatic ash, soot blowers, and other field ash, ash from the boiler and out away. Dust removing device, which includes a variety of dust action of gravity, inertial force, centrifugal force, washing bar-type, sound wave, filtering, static electricity, etc., fly ash out of the boiler flue gas, to protect the environment. Instruments, automatic control devices and valves, including the role of pressure gauge, a thermometer, a water level gauge, the alarm level, the relief valve, water meter, steam flow meter, pressure meter, indicating the exhaust of carbon dioxide and other instruments, a steam valve, a valve, a check valve, like the valve discharge valve, and automatic detection, automatic protection, control and automatic adjustment and automatic computer control means. The boiler more safe, economical operation. These are the auxiliary device structure of the boiler, I believe you must have learned a lot of knowledge of it, I hope this helps you make better use of boiler equipment.

Calculated gas coal steam boiler manufacturers central luzon plant to explain your boiler heating area: Gas-fired steam boiler plant to you to explain the calculation method of gas steam boiler heating area of ​​the boiler, which is sure to install emissions-line monitoring devices, and, should environmental protection department of the monitoring center networking, so the job. And this kind of boiler heating area, specifically, then, is to be determined according to the location of the boiler, its usage and requirements. Generally speaking, if it is 1 ton, then, it is about 7000 square meters of heating area. 4 tons of gas steam boiler, which uses induced draft fan, then, that in the selection and configuration, generally speaking, if a different motor, then, there is a different choice, but specifically, then, is there are two First, Y5-47-6C, power is 15KW / 18.5kw, grade 2 is a motor; Second Y6-41-7.1C, power is 15kw / 18.5kw, the motor is four. 10 tons of gas steam boiler, between it and the workshop is to have a safe distance, and can not be a piece design, it must be independent. Therefore, it is generally to be more than 5 meters, so the job, however, can also be separated coal field.

Our emphasis on increasing green, local governments also boiler operation produces nitrogen oxides and smoke emission requirements become more stringent. Fast boiler followed by the national trend of development, deepening of cleaning boiler product design and development. Lulu as a representative of business development of the national beverage, and hope to find a set of boiler energy conservation and clean in one, for drink production process of fermentation, sterilization, drying, curing and other processes. After many visits and market research, in October 2017 and entered into boiler fast boiler purchase contracts, purchase two 10 tons of steam and a whole 20 tons of steam condensing coal steam boiler manufacturers central luzon. The two sides this cooperation is the other quality fast condensing gas boiler highly recognized, has proved a powerful strength fast boiler in the boiler production and service of gas condensate from the side.