Tel No. (+86) 371-55629010

10MW Biomass Power Plant Boiler in Pakistan

How many calories Horizontal one ton steam 10mw biomass power plant boiler in pakistan needs? 1 ton steam boiler, require 600,000 calories, biomass is the most economical fuel. 1 t of steam boilers, 600,000 calories needed, is converted into fuels: diesel 58kg / hour, i.e. cost of diesel and 466 / hour; biomass particles 150kg / hour, the cost of 165 / hour. 697 electrical degrees / hour, i.e. cost of electricity 697 / hour; gas 75m3 / hour, i.e. cost of natural gas 375 / hour; 120kg of coal / hour, i.e. cost of coal is about $ 120. As can be seen from the above, coal and biomass particles are the most economical. Wherein the combustion of coal is difficult to control, and the actual consumption costs considerably biomass particles. However, polluting coal boiler is very large, and the biomass boiler is both economical, and environmentally friendly. Accordingly, we can see that biomass pellet boiler is the best future direction of development of the industry boiler, the boiler will also become the industry mainstream.

The biomass power plant 10mw biomass power plant boiler in pakistans burn Sugarcane bagasse,Rice husk ,rice straw,Coconut shell,Palm kernel shell ,agricultural waste,Wood pellet or chips,Sawdust and other biomass fuels to generate steam and heat to meet different heat supply and electricity requirement.And it is widely use in large scale central heating, thermal power plant.

After the project identification, party fast technical staff soon made contact with our company, to our installation, commissioning, to ensure the look normal, stable use during 10mw biomass power plant boiler in pakistan operation. Thanks fast boiler professional technical support and good service, I provide a lot of help for the textile dyeing and finishing production company. --customer feedback

Biomass fired steam 10mw biomass power plant boiler in pakistan combustion process

The biomass fuel is fed into the furnace screw feeder, where due to the high temperature flue gas and the role of the primary air gradually preheating, drying, fire, burning, this process a large number of volatile precipitation, burn vigorously. After the resulting erosion main heating surface temperature flue gas boiler, the boiler economizer heating surface of the tail and air preheater, and then into the dust, and finally through the chimney into the atmosphere. Not gasified fuel side to the rear of the grate movement until burnout, the last remaining small amount of ash fall behind the grate slag mouth.