Tel No. (+86) 371-55629010

Coal Boiler Of 11Ton Capacity

As to chain grate coal boiler of 11ton capacity, boiler chain grate deliveries solid fuels like coal and biomass pellet into boiler chamber, the fuel burning in the chamber, turn into thermal power, and produce tons of steam per hour. In technology designs, SZL series chain grate boiler has new furnace wall design, resulting in low heat loss and high thermal efficiency, which can lower boiler running costs in brick factory. Besides, SZL series boiler is composed of a main boiler frame, rear cast-iron fuel economizer, flues, auxiliary boiler, and pipeline valve instruments. Packaged structure in design, less problems in boiler installation. And it has automatic operation system, to reach clients requirements in details.

Desulfurization material to burn rice husk, sawdust, wood and coal coal boiler of 11ton capacitys sweep away dust and dust wipe away dust. And a variety of kilns sweep away dust desulfurization. 10 tons of boiler sweep away dust Series sweep away dust desulfurization equipment to solve the high temperature, corrosion, leaching, smoke, desulfurization and other issues. Disposal of flue gas volume: 3000-600000 m3 / h, the desulfurization efficiency up to 85%.

Coal fired CFB coal boiler of 11ton capacity technology:

In view of the possible near-term benefits, ZG recently funded an assessment of coal fired power plants equipped with three different combustion systems: Kinds of coal, Circulating Fluidized Bed (CFB), and biomass fired circulating fluidized bed. The purpose of this study was to establish, through engineering analysis, the most cost-effective performance potential available through improvement in the steam conditions and combustion systems.

Since last year, the city of Yinchuan in Ningxia to develop clean energy alternative to coal heating work carried out, in order to adhere to the use of waste heat energy-based heating system, two years, a total removal of 212 coal-fired coal boiler of 11ton capacity units, designed over 20 million square heating area Meter. At present, Yinchuan City, the formation of a waste heat recovery and cogeneration-based, clean energy co-existence of a new pattern of heating, coal heating gradually withdraw from the stage of history.

According to Yinchuan City Housing Construction Bureau feedback, early last year, Yinchuan City, began to promote the implementation of "East of the West to give a" heat of long-distance heating projects, the long-distance transmission projects across the Yellow River, the basic realization of restructuring heat source, heat source interconnection point to ensure the city heating security and stability, environmental protection is of great significance.

At present, "East of the West to give a" central heating heating net charge of the project, the city branch, etc. have been completed, the east, the city water pipe network has been completed and started flushing cycle, is west of the water, water totaled 145,000 cubic meters.

At the same time, Yinchuan City, also build a heat source, thermoelectric Xixia complete the second phase of construction, the new 2 sets of 350,000 kilowatts supercritical coal-fired air-cooled heat generators, which can effectively replace Yinchuan City, 154 small coal-fired boilers, the annual generating capacity 3.85 billion kwh, heating capacity of 16.42 million square meters.

This year Yinchuan new cogeneration district heating area of ​​41 million square meters, the new heating pipe network 86 kilometers, is the largest investment project ever central heating, with the largest of the year.