Tel No. (+86) 371-55629010

knight fire tube boiler

It provides fast side of knight fire tube boiler equipment, installation and commissioning after all normal, we immediately put into use, the hotel did not delay the normal heating. Meanwhile boiler capacity, energy efficient, fully able to meet the needs of heating and bathing water in our hotel rooms. --customer feedback

In order to keep the internal heating surface cleaning, priming avoid the deterioration of the quality of steam, there must be a sewage system for the knight fire tube boiler. 1.1 sewage regularly withdrawn from the bottom of the header furnace precipitate. In addition to regularly drain the sewage sediment, but also can quickly adjust the boiler water quality, to supplement the lack of continuous blowdown. It does not allow for regular sewage. You should carefully sewage before normal shutdown.

Note sootblowing manually knight fire tube boiler (1) to ensure the security, acetylene cylinders must be placed in designated locations, lock, and prevents loss of pressure valve member; (2) solenoid valve according to a switching operation time must be designed for a given time, timeout is prohibited; (3) follow the operation procedures; and (4) when the pressure of acetylene below the allowable value, the cylinder should be replaced; (5) the case of boiler fouling, sootblowing a class can begin to gradually reduce to-day once; (6) open timing of a hydrophobic, water and remove the inner tube.

How condensing gas furnace functions: gas condensation in the furnace during operation, as with a conventional knight fire tube boiler, water is heated by the heat of combustion. Combustion flue gas is typically discharged through the flue. Thus, the heat in the flue gas will be exhausted to the outside. However, the flue gas condensation technique may be utilized. Since the flue gas is composed by a large number of high-temperature steam, condensation techniques may utilize flue gas heat, and then the heat acquired input heating circuit.