fire water tube horizontal 6ton 4 ton 2ton coal fired steam boiler

About six tons of fire water tube horizontal 6ton 4 ton 2ton coal fired steam boiler shutdown of a temporary shutdown: It is planned, therefore slow cooling during shutdown protection device, it should also pay attention to safety, pause furnace according to the rules in Chapter IV Fenghuo (pressure fire) get on. 2, safety shutdown: care should be completely stopped even on normal operation plan for 1 to 3 months to be a shutdown, shutdown should maintain more safety injection apparatus, after the shutdown, and other water-cooled furnace to below 70 ℃ when they let go of the gas, open manholes, hand holes, rinse the pot with water scale. 3, emergency shutdown: the boiler operation, when the case of the following circumstances, should an emergency shutdown, and notify the relevant authorities. (1) expanding the cease-fire should first see if the water table level is called to take water law. If Inception water table, water cock side, and then close the steam cock, and then turn on the water faucet open and close repeatedly called after water, still can not see the water. (2) All water supply equipment failure. (3) All water gauge, pressure gauge, safety one of all the failures. (4) a boiler or furnace wall element damage, serious threat to the safe operation of the boiler, emergency shutdown, should focus on preventing the stop of the accident and the specific steps as follows: ① first blowing off; ② the coal on the grate red raking; ③ Close induced draft fan.

The third reason is that the amount of nitrogen oxide released during operation is very small. Most heating equipment such as ordinary boilers need to use coal materials as raw materials when they are in operation. Materials such as coal generally release a large amount of hazardous air-quality substances when burned. The condensing boiler uses the steam produced by natural gas combustion as the raw material when it is in operation, so the nitrogen oxide content released during the operation is much lower than the prescribed standard. The analysis of the reason for the year-by-year increase in the sales of condensing boilers has come to an end for the time being.

Fire fighting methods inventory boiler in the boiler use, if a fire phenomenon, you know how to deal with it? Today, Xiao Bian teach you the recipe. When coal is poor or low load, it may be administered less number, to maintain a high pulverized coal concentration, but can not chipping operation or asymmetric operation. Load is less than 170MW, should remain A, B powder layer to stable operation, when any failure to a powder, should be administered stable combustion, the failure to the powder to be put into operation, combustion stability, and then exit the gun run . Adjustment of the amount of the low-load air supply, to maintain the oxygen 4-5%, and adjust the opening degree of the auxiliary windshield. If it is a bad case of fire, may be appropriate to increase the primary air temperature, wind speed reduces time, but not overshoot the spark plugs burned once or blocked ducts. When the job should be strictly periodic system and to reduce powder powder switching system, dust bunker normal position at least 2.5 meters, so that a stable working state bunker, at each adjusting shutter powder to powder, the powder as far as possible amount consistent and stable, no spark plugs to prevent dust and to dust gravity caused by combustion fluctuations. Should maintain acceptable fineness of pulverized coal, according to chemical analysis, after adjusting the test plate to open Classifier, coal is poor or low load, it may be appropriate to increase the fineness of pulverized coal, in order to facilitate combustion. Maintain normal milling system, powder separator shall not clogging the tertiary air pinkish large deterioration in combustion. Furnace can eliminate air leakage and air leakage milling system, all view of the fire without plugging holes, play Giocondo, etc. should be tightly closed. Value of the long should keep abreast of the situation of coal and coal quality fuel, combustion instability occurs when, such as when a fault powder, coal mutation, the differential signal changes drum is too large, the oil should immediately cast coal combustion stability and taking samples for analysis. High load, the premise of ensuring steam temperature, combustion can be appropriately adjusted to prevent the shift of the center of the flame, so that the furnace exit gas temperature rise, caused by coking. Operator adjusting the main steam temperature may be employed with positive pagoda wind run, the central flame stabilizer. Should be a bellows pressure control as a basis for wind speed, in time to observe the duct pressure and temperature, the premise of ensuring primary air duct is not blocked, a bellows pressure should not exceed 4000Pa.

June 20 this year, Changji Hui Autonomous Prefecture in Xinjiang Uygur Hutubi County textile industrial park a LOHAS fruit and vegetable plant in the region, two workers were dismantling a height of 20 tons of steam coal-fired boiler chimney 50 meters, which is Finally, the county removed a large tonnage of coal-fired boiler, after the removal of 300 tons per year to reduce coal pollution.

After removal of coal-fired boilers, textile industrial park will access a unified steam heating system, the coal-fired boiler plant will be dismantled access system, both low nitrogen environmentally friendly and energy efficient.

In recent years, Hutubi County to respond positively to China's environmental protection policy, and vigorously promote the "Blue Sky Project", to conduct a comprehensive environmental management and air pollution control activities that will improve air quality as the top priority of economic and social development.

It is understood that Hutubi County this year to increase environmental protection efforts, the New Chemical Materials Park, Textile Park, a new industrial park and other parks coal-fired boilers are dismantled processing equipment, present the industrial park has been demolished 67 companies a total of 98 fuel stations coal boiler, after the removal of 10,000 tons per year to reduce coal pollution.

Secretary Hutubi County Industrial Park Administrative Committee of Economic Development, Sun Xiaotong said: "Industrial Park to good project access, the introduction of new projects, environmental protection must first over that hurdle; increase the park's environmental infrastructure investment , to lay the foundation for entry into the project; increase the industrial enterprises of environmental remediation efforts, requires companies to complete the task of environmental protection standards, to achieve green development, restructuring and development, quality development. "

April 6 this year, Hutubi County has also set tough fight pollution prevention and control headquarters, hand drawn increasing ecological environmental issues reform efforts, strict implementation of environmental protection, "A Pair of responsibility," "party and government with responsibility" layer by layer progressive pressure tight compaction tasks to ensure that environmental issues rectification precise place.

Deputy Director of Hutubi County Office of Pollution Prevention battle command room Zhangxin Hao said: "conscientiously implement the idea of ​​ecological civilization Xi Jinping, the CPC Central Committee and implement the spirit of ecological protection zone state Assembly to do the rectification work to promote the co-ordination of environmental protection issues, and resolutely fight tough fight pollution prevention efforts to build a sky blue green water of the Qing Hutubi. "