Tel No. (+86) 371-55629010

1 Ton Boiler Distributor Kyrgyzstan

When use of electric 1 ton boiler distributor kyrgyzstans, power costs are: 1 kWh of heat is 860kcal / kWh × thermal efficiency of 90% = 774kcal / kWh; 1 tons of water power consumption of 35000kcal ÷ 774kcal / kWh = 45.22 degrees,

Fuel steam 1 ton boiler distributor kyrgyzstan antifreeze function: fuel steam boiler temperature protection: detects when dry protection to a temperature above 95 deg.] C, the heating tube immediately cut off the power supply; leakage protection: upon detection of the leakage current is greater than 15mA, immediately cut off power to prevent electrocution, the display shows the fault code and warning information, troubleshooting, controller reboot before it can work properly.

Steam 1 ton boiler distributor kyrgyzstan and hot water boiler inspection and sludge screw pump works fast boiler's Henan Xiao Bian now introduce steam boiler and hot water boiler inspection and sludge screw pump working principle On the steam boiler and hot water boiler inspection three major step routine testing is the most basic test. Because of internal and external boiler as a whole, we must first conduct a basic test. Routine testing basic skills test is working boiler, thus requiring inspectors should have more extensive testing and analytical skills. First, inspectors steam boiler and hot water boiler in the boiler inspection, they should prepare the following tools: 1,0.25-0.5 kilogram pointed a hammer; section 2, a good three flashlight; 3,155 mm ruler one; 4,2 meters a steel tape; 5,310-500 mm a straight ruler; 6,5-20 each a magnifying glass and a mirror; a 71.3 mm inner and outer calipers; 8, self-arc a small model scale and a soft curve; 9, an ultrasonic thickness gauge; 10, recording tools and protective equipment I. Second, the steam boiler and hot water boiler Appearance test: test boiler body structure and the respective pressure element is reasonable, the presence of any defects and welding pressure element metal surface joints, such as corrosion, wear, cracks or obvious from the groove, modification, bracing and without fracture connecting seam, weld surface defect status. When tested suspected crack may occur somewhere, But, it can not verify visually, then you can use a solution of nitric acid concentration of 10% of the erosion of the suspicious place, wipe, and then observed with a magnifying glass to determine whether a crack. There swag scale adhered to the steel sheet needs to be tested when the test hammer tip may be used to scale, rust knock, carefully tested after wiping. Third, the hot water boiler steam boiler and hammering inspection: when testing, with the test hammer percussion pressure receiving portion being tested member, tactile feel with auditory, visual inspection methods to determine the presence or absence of a defect. Proper understanding of this method, the degree of judgment to do right, is basic reaction boiler inspector whether a solid aspect. Test hammer test used, is a flat round, the other end is pointed, with a handle made of solid material adjacent to a hammerhead neck portion of the handle to the car, so that when in use the handle on the flexible, in order to increase feel stretch back to size to determine the test case. Sludge is the use of a screw intermeshing screws or the volume number of the change in absorption, the volume of the liquid discharge pump rotor. Active screw extending through the pump housing by a prime mover driving the stuffing box. Active driven screw and screw threaded in the opposite, a left-hand thread, the other a right-hand thread. Sludge screw having a wide flow range, the discharge pressure, high efficiency and stable characteristics of the work, but the process is complicated and the manufacturing cost. It is suitable for transporting oily liquids, also gas-liquid mixed phase fluid transport, the high viscosity fluid, such as acrylic slurry, etc., it is widely used in the oil, synthetic rubber, synthetic fiber production. Henan is committed to fast boiler steam boiler manufacturing, product quality, reasonable prices and widespread industry praise, if you have any needs, please contact us!

Directly under the Central Government Offices Administration (referred to as the straight Authority) is the CPC Central Committee and subordinate units, are responsible for the CPC Central Committee and services for the organs and services, an important function of serving the people. Central Government institutions funds, finance, public service vehicles, the state-owned assets and real estate management, service management is responsible for the specified life of the party and state leaders as well as services related objects.