Tel No. (+86) 371-55629010

7mw oil fired hot water boiler in russia

Matters needing attention in installation of Gas-fired BoilerGas-fired boiler also says that gas-fired heating boiler is a kind of boiler which uses gas combustion to heat water to satisfy people's heating. It belongs to the category of domestic boiler. By gas-fired heating boiler we usually refer to gas-fired atmospheric 7mw fired hot water boiler in russia, gas including natural gas, liquefied gas, city gas, coke oven gas, biogas and so on. There are explosion-proof doors on the rear of the fuel-fired boiler or on the smoke pipe, and the position of the explosion-proof doors should be conducive to the discharge of the explosion. In cases where explosive gas may endanger the safety of operators, a pressure relief guide tube shall be installed on the explosion-proof door. The installation of boilers, auxiliary machines and water treatment equipment shall be in accordance with the technical requirements of the equipment manufacturing plant. . The equipment foundation must wait until the equipment arrives and checks correctly with the design drawing before construction. 3. When installing the equipment, avoid the equipment, and the installation material should be stacked on the floor. When using building column, beam lifting equipment, the bearing capacity of beam and column must be verified in advance. 4. After installation of oil, gas, hot water and steam pipes, the pressure test acceptance shall be carried out according to the Code for Construction and acceptance of Industrial Metal Piping Engineering GB 50235 / 1997.

Gas boiler safe operating procedures: gas-fired boilers this kitchen I believe we are not unfamiliar fishes it. But this thing is not so easy, and sometimes improper operation causing very serious consequences, so the gas boiler rules is very important. That in the end this is how the specific operation of it, if you want to know, quickly told us with a look. 1. All personnel must be familiar with the operation of the boiler performance and safety knowledge of the boiler operating certificates. This post is strictly prohibited non-operating personnel. Duty should be strictly in accordance with the operating records and do a good job shift recording, the security situation and the device should shift change operation tests, carried out. When the shift to check the boiler is intact. 2. Boilers and safety accessories should be inspected, and in the period. 3. Kai blast furnace gas furnace ready ① Check if the gas pressure is normal, not too high or too low, open the door of oil and gas supply section; ② Check whether the pump Sheung Shui, or opening the purge valve, until the Sheung Shui so far. Open the Water Supply System for each section of the door (front door section Sheung including pumps and boilers); ③ check level gauge, the water level should be in the normal position, the water level gauge, a water level required color plug in the open position, the water level to prevent false, if water can be manually Sheung; ④ check valves on the pressure pipe, must be opened, the wind deflector must all flue opening; each knob ⑤ checks the control cabinet are in their normal position; ⑥ steam boiler check valve should be in the closed state 7mw fired hot water boiler in russia circulating pump outlet valve should be turned off; ⑦ checking water softening equipment is operating properly, a variety of indicators to create a soft water meets national standards. Open the power ⑴; ⑵ startup burner; ⑶ purge valve on the drum, is completely out of steam, the off; ⑷ inspection hole into the boiler, and the hand hole flange valves, the leak was found to be fastened, tight as the solid leakage maintenance shutdown; ⑸ pressure rise when 0.05 ~ 0.1MPA, replenishment, sewage, water supply systems and sewage screening test device while flushing water table; ⑹ when the pressure was raised to 0.1 ~ 0.15MPA, flushing pressure gauge trap; ⑺ when the pressure was raised to 0.3MPA, "fire load / small fire" knob to "fire" to strengthen the combustion; ⑻ when the pressure was raised to 2/3 of the operating pressure, start warming air supply tube, slowly open the main steam valve, to avoid water hammer; ⑼ drain valve is completely closed out of steam; ⑽ after all the drain valve closed, slowly open the main valve to open, and then half a turn; ⑾ "burner control" knob to " Auto "; ⑿ level adjustment: adjusting the water level (to manually start and stop the pump) according to a load, low load level should be slightly higher than the normal level, high load level should be slightly lower than the normal level; ⒀ steam pressure adjustment: adjusted according to a load combustion (manual adjustment Fire / small fire) ⒁ combustion state determination, determines the amount of fuel atomization air ⒂ observation condition exhaust gas temperature, smoke, temperature control is generally between 220--250 ℃ The flame color, smoke color, while observing the chimney exhaust gas temperature , concentration, adjusted to the optimum combustion state. ⑴ Open the power; ⑵ start the circulation pump; ⑶ slow circulation pump outlet valve; ⑷ startup burner; ⑸15 min "" Load fire / small fire "bit color button is turned to" fire "" ⑹ "burner control" knob spin to "automatic." 5A normal shutdown: hot water boiler ① "fire load / small fire" knob to "small fire"; ② off the burner; ③ close the fuel supply valve; ④ ⑤ closing dampers boiler after the temperature dropped to 50 ℃ , the circulation pump outlet valve closed. ⑥ stop circulation pump

1: Steam boiler steam pressure the higher the better selection pressure, depending on the user's requirements. Vapor pressure, safety pressure member Advantageously, the energy consumption is low; but the steam will be relatively worse quality, low enthalpy, humidity, may be difficult to meet the disinfection, sterilization, culture, heating and power needs. And the high vapor pressure, energy consumption is high, the corresponding steam equipment, piping and valves the pressure is high, the maintenance requirements are also more, the production of steam, the heat transfer process, a large leakage loss. Meanwhile, high-pressure steam as the steam pressure is increased to carry the increased salinity, so salinity these waterwall tubes, pipe tobacco, and other drum heating surface fouling, overheating, foaming, clogging even increase the possibility of squib. Salt steam to steam turbine flow area will decrease, reducing the efficiency and seriously affect the heat transfer. Thus, fireman must operate in accordance with operation of the steam pressure, the steam pressure fluctuations generally allows a value between 0.05 ~ 0.15MPa.

2: the higher the boiler water level was considered safe water level is higher, the boiler water is not easy, security is also guaranteed. In fact, this is a misconception, the water level is too high, steam and humidity increase, poor steam quality, steam equipment will harm and production results. Industrial boilers, a moisture vapor sterilization or incubation with a large amount of steam also increased salt, or culture for a long time ranging from sterilization, steam consumption increase, ineffective, decreased production culture; weight is not reached the purpose of disinfection or cultured biological products contaminated scrap, even pipes, water hammer occurs apparatus. For utility boilers, steam moisture capacity, the steam turbine last stage blades will be erosion, there may appear Priming pot, water shock severe enough to cause harm equipment and personal safety. Thus, the pot water level should be maintained within a fluctuation range of ± 50mm well.

3: Some people think the better fuel plus fuel plus the more productive the greater the amount of steam. Little do they know too much fuel into the furnace, the effect will be counterproductive. When a certain amount of air and the excess amount of fuel, the furnace will produce a large amount of incomplete combustion, resulting in energy waste. People often see the dark furnace flame, weakness, and black smoke chimney, mostly for this reason. In severe cases, there will be fire pulverized coal, oil furnace secondary combustion occurs, burst pipes until shutdown. Therefore, the ratio of fuel and air volume should be adjusted appropriately, typically by looking at the fire, smoke color look, see table indicates the amount of oxygen determined. When the flame in the furnace as a bright yellow, pale gray smoke chimney to take, stable vapor pressure, wind coal showed appropriate ratio, good combustion.

4: Dial stirring the fire, the better the fire is commonly used in industrial boilers manual method. By stirring the fire, can be eliminated crater, reduction furnace from the fire and the fire bed smooth, homogeneous combustion, strong. But too much stirring the fire, but will reduce the overall thermal efficiency; this is because when stirring the fire, a lot of cold air into the furnace, reducing the average temperature of the furnace section of the flame. At the same time, increase the heat losses, an increase in the number of black smoke chimney, pollution of the environment. In addition, when stirring the fire, the staff is also susceptible to flame radiation, burns, fire-resistant layer is also susceptible to dial hearth fire damaged tools, increased furnace building maintenance workload. Therefore, the fire should be allocated as needed, to minimize the appropriate dial.

5: the bigger the better furnace pressure and furnace pressure is reflected in one of the boiler combustion conditions is normal or not an important parameter. Operating the boiler furnace negative pressure should be maintained between 10 ~ 20Pa, too great a negative pressure results in: increased leakage furnace, heat losses increase; wind increased electrical energy consumption; fly ash increased the wear along the heating surface; reduced the furnace heat of combustion efficiency. Most gas-fired boiler designed to run slightly positive pressure to increase the combustion rate. Operation, the furnace pressure becomes positive, even increasing the wind is still difficult to maintain the chamber negative pressure, said system failure or the wind furnace wall tubes, superheaters and other soft drinks leakage; fire furnace, the furnace pressure is first reflected table violent swing to the negative direction flung head. Therefore, the furnace pressure must be run according to the provisions, or should pinpoint the cause.

6: sewage longer the better spoken here regularly refers only to the sewage discharge rather than continuous blowdown. Periodic sewage mainly refers to the existence of negative bottom of the boiler slag, dirt and corrosion products, reduce furnace tube fouling, prevent clogging and reduce the salt content of the water boiler, heat transfer enhancement effect. One would think that the longer the discharge time, impurities will be discharged bottom of the pot the more, the better sewage, it is not. Sewage long time, a waste of a lot of heat, affect heating steam pressure; two pairs of boiler water circulation unfavorable, water wall tube burst will occur in severe cases. Thus, the sewage must be periodically according to "ground discharge, the discharge less uniform row" principle, provided hand operation. General Provisions at least once every eight hours of sewage, sewage each time shall not exceed 30s, overtime is strictly prohibited.

Wuhan Port District Social Welfare Institute (apartments for the elderly) is invested by the government pension services, with a total construction area of ​​38,000 square meters, 532 beds, mainly adopt destitute persons, social support on behalf of the elderly. Hope to provide welfare to the elderly year-round 24-hour hot water, the original boiler equipment can not meet this demand, therefore, require additional purchase orphanage 7mw fired hot water boiler in russia. After much investigation, in cooperation with the welfare determined fast boiler, provides three integrally condensing gas hot water boiler (WNS1.4-1.0 / 95/70-Y.Q) by a fast boiler.