Tel No. (+86) 371-55629010

Waste Woode Fired 12 Ton Boiler For Paper Mill

Former industrial waste woode fired 12 ton boiler for paper mill operation needs to be done what needs to be done before what things industrial boilers run? Industrial boiler combustion is an important part of the heating medium to provide thermal power. If the operator is not skilled technical, operational errors do not even know the safe operation of boiler technology will cause serious boiler accidents. So before running industrial boilers, industrial boilers before running what needs to be done? First, managers need to boilers and boiler technicians familiar with the structure used in certain boilers, performance, and at the same time have a high sense of responsibility. At the same time, we must do the following work: pre-industrial boilers and ready to run the test - test before the ignition for a new boiler installation, repair, or after a long shutdown, must be carefully checked before the fire which is to ensure that the boiler. safe operation, and to avoid a failure of technology into the operation of an important part of the accident. Check and prepare the inner portion inside the boiler 1. Check the pipe before ignition, such as a steam separator, a continuous sewage pipe (sewer ground), a conventional sewage, separators and the like into the water before the desired industrial boiler operation, should be complete and intact. 2. conduit (boiler housing, body, head, etc.), set top box and the heating surface should be cleaned of dirt, no defects or damage, the pot without tools and other debris.

5, steel flue and reliable insulation measures should be fixed.

6, a fuel gas boiler room boiler should correspond to a chimney, when required by the conditions a boiler flue or chimney common to several units, each boiler should be ventilated suction force balance.

7, when the flue arrangement provided the necessary thermal and environmental measuring point measuring point in place. Single rated evaporation amount is equal to 20t / h or single thermal rating of greater than or equal 14MW oil-fired boiler, a fixed continuous monitoring must be installed in the flue gas dust, SO2 emission concentration instrument.

8, in the flue gas gathering place easily and when many boilers a share or a total chimney flue shall be fitted with explosion-proof door on the flue after each fuel gas-fired boiler, the location of the vent should be conducive to relief, It should be provided without jeopardizing personnel safety and proper position before turning, when explosive gas may endanger the safety of the operator that should be installed on the guide tube explosion relief means.

9, for some long flue boiler room, they should be accounted for resistance, select the appropriate blower, Fan (when there is draft fan), to ensure the smooth flow of exhaust.

Our emphasis on increasing green, local governments also waste woode fired 12 ton boiler for paper mill operation produces nitrogen oxides and smoke emission requirements become more stringent. Fast boiler followed by the national trend of development, deepening of cleaning boiler product design and development. Lulu as a representative of business development of the national beverage, and hope to find a set of boiler energy conservation and clean in one, for drink production process of fermentation, sterilization, drying, curing and other processes. After many visits and market research, in October 2017 and entered into boiler fast boiler purchase contracts, purchase two 10 tons of steam and a whole 20 tons of steam condensing steam boiler. The two sides this cooperation is the other quality fast condensing gas boiler highly recognized, has proved a powerful strength fast boiler in the boiler production and service of gas condensate from the side.

Must the sewerage pipe of gas-fired waste woode fired 12 ton boiler for paper mill be seamless steel pipe? Sewerage pipes for gas-fired boilers are advised to use seamless steel tubes, as this will avoid problems in the process of use. Moreover, it is generally required that each boiler should have its own separate sewerage pipe and be connected to a blowdown expander or drain cooling tank. If several boilers share a sewerage pipe, a cut-off valve should be installed on it.