Tel No. (+86) 371-55629010

high pressure 2 ton steam generator

Nehe small gas steam boiler that so many companies choose to actually miniaturized gas steam boiler intention quantity is relatively large, and therefore this type of small gas steam boiler high pressure 2 ton steam generator, also known as, through the burner temperature reached 100 degrees, it will a steam rapidly, thereby satisfying the needs of customers manufacturing. This is we often want to know the small gas steam boiler. Therefore how we choose gas steam boiler, in fact, we generally can be selected from a gas steam boiler or gas itself a huge advantage, and some users to solve their own electricity output, that is, we choose gas steam boiler electricity can slash own expense. If gas steam boiler sizes are especially large natural gas pipeline nor through the auxiliary can be selected biomass gas steam boiler can reduce gas costs, through their own manufacturing biomass, can achieve rapid burning of fuel. If water vapor intention particular small numbers can be selected often said steam generator, with a small cost to do a big demand!

The boiler is important to the national economy electricity energy supply equipment, machinery, metallurgy, chemicals, textiles, paper, food and other industries, as well as industrial and civil heating boiler needs to supply large amounts of heat. Boilers using fuel combustion energy released or other energy to the working fluid (heat carrier intermediate) is heated to a certain device parameters. For heating the water to make it into the boiler steam is known as steam boilers, also known as a high pressure 2 ton steam generator for heating water to make them more water into the boiler temperature, known as the hot water boiler for heating of Heat Transfer Fluid It called boiler organic heat carrier boiler. From the energy point of view, the energy conversion device is a boiler. In a boiler, a chemical energy (fuel) storage by the combustion process into the combustion products (flue gases and ash) contained some heat, then the heat transfer process by transferring heat to the intermediate heat medium (e.g. water, and steam), it relies on the heat transport device to heat. This intermediate heating medium to transfer heat energy belonging to the second, because its purpose is to provide a device capable Into energy. When the intermediate heating medium for heat conversion in a thermal power machine, the work called quality. If only the intermediate transmission to the heating medium heating device to provide heat for heat utilization, is usually referred to as heating medium. It can be divided into four categories according to their use boiler power plant boilers, industrial boilers, marine boilers and locomotive boilers. The first two categories, also known as fixed boiler, because it is mounted on a fixed basis and immovable. The latter two are called mobile boiler. This book presents a stationary industrial boilers. The boiler in three main processes: (1) the fuel combustion in the furnace, which can be released in a chemical storage form of energy, the flame and products of combustion (flue gases and ash) having a high temperature. (2) high-temperature flame and smoke for heating the working fluid (heat medium) by heat transfer. (3) working fluid (heat medium) is heated to raise its temperature of vaporization or saturated steam, or further heated to become superheated steam. The above three processes are interrelated and simultaneously, to achieve the conversion and transfer energy. Along with the energy conversion and transfer of flow and also the changes of: (1) working fluid, for example water supply (or return> into the boiler, and finally reveal the form of steam (or hot water) (2) fuel, for example. combustion of coal into the furnace, which together with the combustion of the combustible portion of the original moisture content of the flue gas into which the original residual ash is ash-containing. (3) air into the furnace, wherein the combustion of oxygen to participate in the reaction, the reaction and the excess air the remaining inert gas is mixed in the flue gas is discharged. FAW water system, a coal ash smoking system is a system of wind two three main boiler system, the work of these three systems are performed simultaneously. this typically fuel and flue gas side process (involving the combustion, heat, slag, gas flow, etc.) collectively referred to as a furnace process; the process performed by water, steam which side -1 (steam and water flow, heat, vaporization, water separation, thermo-chemical processes, etc.) collectively referred to as the pot process. the main parameters of the boiler, the boiler comprising a heat generation quantity and quality indicators of both. as the main parameters of the number of steam boilers and steam production of the steam pressure, temperature, water the main parameters of the boiler Hot water flow rate and pressure of hot water temperature.

About boiler, daily attention to ten o'clock analysis of its original meaning, it means the pot is heated in a water container on the fire place burning stove refers to fuel the boiler including the two most from the pot and stove included. Today, we say that the boiler is the use of fuel or other energy hot water heating can become mechanical equipment of hot water or steam. Generating hot water or steam boiler may provide heat directly to the required industrial production and the people's living, the steam power plant can also be converted into mechanical energy by the generator can convert the mechanical energy into electrical energy. Because the frequency of use of the boiler is high, so it's for routine repairs and maintenance is also very important, here are ten aspects regarding boiler need attention, we divided into two parts to illustrate: First, note the boiler: (1) boiler factory, should be accompanied by quality certification, safety instructions and other supporting information. (2) boiler installation, maintenance and renovation should be obtained qualifications in this area for the job, not blindly, to avoid problems. (3) boiler to be registered before the registration can be used, and to be performed by professional job. (4) the operator while operating the boiler, and eight systems should abide by the rules and six records. (5) boiler and its safety accessories to be tested on a regular basis, no test can not be used. Second, boiler routine maintenance: (1) Check the boiler pressure gauge, water gauge, safety valve, sewage plant, the steam supply valve and the valve and verify its compliance with the performance requirements. (2) Check the automatic control device system meets the requirements. (3) Check the boiler feedwater system meets the requirements. (4) on the blower, induced draft fan, damper, etc., to see if intact, is working. (5) boiler should be regularly checked once a problem is found to be in time, so as not to affect the normal operation.

Beiqi Panther car 6 tons of steam condensing one fuel gas steam boiler project has been successfully completed. This series boiler adopt advanced design concepts, using the waste heat of flue gas cascade, with the use of the condenser and the economizer fully absorb the waste heat in the flue gas, the boiler efficiency has been greatly improved.