Tel No. (+86) 371-55629010

allahabad industries list name power plant for boiler

During the smelting process and coking manufacturing, coke oven gas is generated, and the by-product gas can be recycled as fuel for allahabad industries list name power plant for boiler to generate energy for the coking, smelting, iron making industry.

Damage of load-bearing parts of Boiler and its Prevention

The basic requirements of safety and reliability of boiler structure are as follows: (1) all heating surfaces of boiler should be cooled reliably; (2) the thermal expansion of each part of boiler should meet the requirements after the boiler is heated, and the basic requirements of boiler structure are: 1) the heating surface of boiler should be cooled reliably; (3) the compression components of boiler have sufficient strength and compactness; (4) the boiler furnace and flue have certain anti-explosion ability; (5) the load-bearing parts of boiler should have sufficient strength, stiffness and stability, and can meet the seismic requirements of the area in which they are located; Boiler structure should be convenient for installation, maintenance and operation. In the past, the failure of boiler parts was analyzed, and more attention was paid to overheating, corrosion, wear and welding quality. Once the steam pipe, water pipe and pipe can't bear the internal pressure under the action of steam and water pressure, the tube boiler will burst and leak. However, since the suspended boiler structure has been adopted, because of the boiler heating surface, steam-water header, pipe, flue coal pipeline all through the hanger, beam, truss, by the steel column load-bearing; and with the expansion center as the zero point, down, and around the expansion. Once the load-bearing system fails and the parts are attached, the geometric shape of the components will change, which can also lead to the failure of the boiler parts. The theoretical calculation shows that a slender heat pipe can bear high internal pressure, but it cannot bear normal axial pressure, let alone bear. Due to the lateral bending force, we must pay attention to the deformation failure. Looking at the damage accident of boiler load-bearing parts, it is not difficult to find some characteristics of the damage accidents of supporting hangers:

Such movement is generally designed and manufactured by the allahabad industries list name power plant for boiler manufacturer, vertical burning design, cooling the upper half, the lower half of the condensate, mainly to that card type represents W. Advantages: The crude flow duct of such condensing means foot, low water quality requirements, easy to scale the inner tube, the scale is not enforced protection agents. Drawback: a, due to the design of the structure, larger, but the lack of power is not, in general can do 28KW. B, between the fins prone sticky ash gray block, requiring regular use wire brushing. However, due to the use of cast aluminum, to be very careful when you clean up, you can not destroy the coating. Once the coating scratches, cracks easily burn through the formation of corrosion. Existing domestic manufacturers in the development of stainless steel models, has not been a large number of finished products to market commercialization. C, the bottom immersed in an acidic condensate, the conduit at the level of corrosion is often the hardest hit, severe corrosion bumthrough concentrated thereto. 3, aluminum jacket fins Rib (needle) form Introduction:

Wuhan Yu Dahua Group Co., Ltd. is a cotton based, weaving, knitting and textile car decoration installation in one of the cross-industry, diversified and comprehensive export-oriented enterprise groups. 2017, the Group expanded production scale textile processing, the number of new production lines, the Group's original steam allahabad industries list name power plant for boiler can not meet the growing demand of orders in urgent need of a new steam boiler purchase. When selecting vendors steam boiler, the boiler output device side fast sustainable high quality steam attracted, decided to cooperate with the fast boiler. Fast art by side to the user site needs analysis, to provide two integrally condensing gas steam boiler (WNS4-1.25-Y.Q).