Tel No. (+86) 371-55629010

pellet boiler systems

Daily maintenance and routine maintenance and maintenance of knowledge knowledge maintenance electric steam pellet boiler systems electric steam boiler 1, the boiler water must be treated to soften water standards-compliant. Repairs, boiler maintenance, you must cut off the power supply must be relief. 2, boiler blowdown must be every day, to ensure clean water in the boiler. 3, always check the transmission line, to the pump, the control box member key health, safety valves and pressure switches, time to find abnormal reasons, timely maintenance. 4, water table should always be kept clean, wash once a day, so ensure to see the water level, moving relief valve once a day, to prevent rusting failure. 5, boiler stop running for a long time, should cut off the power while the boiler, the water inside the pipes put the net to prevent frost damage, rusting. 6, a sudden power outage, the power should be turned off, the inlet valve. 7, by listening, smell, see, touch control box to do normal maintenance work. Such as abnormal phenomenon should immediately cut off the power timely maintenance. 8, the periodic electric heating tube fastening nut and the screw flange connection. 9, electric heating oven in the vapor easy to scale. If there is no softening equipment steam boiler, electric heating is recommended once a month detached, to remove the scale. If treatment equipment should disassemble the tube was heated at six months or a descaling. Note again the electric heating tube connection recovery, good fastening screws on the flange, the fastening screws should be fastened symmetrically repeatedly tightened in order to avoid water leakage occurs. 10, when the boiler is stopped, the power should be cut off, the control box is opened, check all the electrical connections of the nut member, looseness should be tightened to prevent poor contact and electrical wires burning member. 11, every six months or a year the boiler must be an internal cleaning, cleaning work to ensure that the boiler efficiency and service life.

New Year period, Tongchuan City, Shaanxi Province seized by special pressure class inspectors seize the time, nonstop, through the tireless efforts have seven working days, the time limit runs successfully completed the Tongchuan city water quality testing and inspection work hundred sets of heating pellet boiler systemss.

In recent years, with the state-owned enterprises "three for one industry," the pace of the transfer of a separate depth step by step, in 2019, Tongchuan City Gas Co., Ltd. and Tongchuan Mining Co., Ltd. together for the original Tongchuan Coal mining companies and construction companies and their subsidiaries heating boiler units of unified management, are responsible for heating in winter work Yintai District and Wang Yi district within the city limits and nearly 30 residential units.

After receiving the application of these reported that construction of heating boilers, special prosecutor of the city leadership attaches great importance to immediately convene all pressure classes held inspectors "to ensure safety, promote harmony" will mobilize, deploy test the backbone of the boiler units get together and reported in accordance with inspection, quantity, wide distribution and other characteristics, develop a reasonable and effective inspection plan, centralized arrangements for the inspection of boiler units, inspectors have extensive under the jurisdiction of the Meiyuan district, dragon community, nearly 30 residential and hospital infrastructure companies run first-line heating boilers, boiler to run one by one test, carried out investigation and security risks, all currently in operation has successfully completed a water quality testing and inspection of boilers, boiler inspection a total of 101 units, 90 water samples boiler. In the access to information process safety management of the outstanding problems that exist in the use of boiler units, in accordance with the relevant regulations and safety requirements of technical specifications, targeted proposed guidance. During the inspection the boiler, for general questions, on-site supervision and the use of units of the rectification. Meanwhile, the inspection found two Royal River Area of ​​boiler pressure parts leak is still sick to run for the safety problems on the spot requires the use of units to stop using the site issued a "special equipment inspection and opinions notice" to use the unit under and timely reported to the Council and served on equipment safety supervision departments seat safety supervision departments to actively supervise the use of the unit for rectification, at present, the use of hidden problems rectification units have been completed, the re-examination confirmed that security risks have been eliminated, effectively guarantee the safe and stable operation of the boiler .

Steam and hot water pellet boiler systems circulating pump and booster pump necessary, you have to find out about you: whether it is steam boiler or hot water boiler, booster pumps and circulation pumps are essential auxiliary equipment, both in installation position, the scope of operation of control and other aspects significantly different. To avoid being deceived everyone in the purchase of non-performing businesses boiler auxiliary equipment, we come to you to talk about, installation, use both the rules and the specific role.

The horizontal biomass pellet boiler systems is easy to operate during use and has a wide fuel adaptability. This has a greater choice of fuel choices and cost savings during use. In terms of environmental protection, clean biomass energy is used, and the boiler emits no pollution during the combustion process, and the environmental performance is excellent.